Search

Search Funnelback University

Search powered by Funnelback
1 - 10 of 19 search results for Economics test |u:people.ast.cam.ac.uk where 1 match all words and 18 match some words.
  1. Fully-matching results

  2. https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_050916.txt

    https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_050916.txt
    22 Sep 2005: The only sensible long term (ie. economic) option is to use internet transfers. ... results. Further tests are still ongoing in conjunction with Omar Almaini the UDS PI.
  3. Results that match 1 of 2 words

  4. https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_051117.txt

    https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_051117.txt
    21 Nov 2005: VDFS VISTA update - DRL v0.1, test data 6. Data archives update 7. ... STH select a more crowded field in which to carry out photometric tests and produce and forward (to JAC) MSBs to enable it to be observed DWE test circular apertures for
  5. https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_051010.txt

    https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_051010.txt
    17 Oct 2005: New data is being received (05B) and ingested. AAO: The AAO archive interface is now mostly completed and is under test. ... This (again) emphasizes the need for a test harness after any significant pipeline changes.
  6. https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_050830.txt

    https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_050830.txt
    1 Sep 2005: of the AAO archive WJS has checked that the Nov 2004 version of the SADT Definition Document is the latest version STH has yet to trial the test version of the ... Images were found to be 0.65" on all chips (Gemini reported 0.5" images in V on the same
  7. photom_v1.2

    https://people.ast.cam.ac.uk/~wfcam/docs/photom_v1.2.pdf
    5 Apr 2005: As confidence in the pipeline reduction is established, then the frequency canbe reduced, perhaps only making the test every time the instrument is mounted.
  8. WFCAM pipeline milestones

    https://people.ast.cam.ac.uk/~wfcam/docs/milestones.html
    6 Jul 2005: 30/09/2003. 01/09/2003. 3. End-to-end demonstration of operation of one mode in both ORACDR and CASU pipelines including comparitive tests of existing (Starlink-based) pipeline, the
  9. https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_050726.txt

    https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_050726.txt
    30 Jul 2005: EGS said that he had been using this for various WFCAM tests and would make this available. ... A test set of detectors being cooled together with an autoguider CCD so that tests including pickup and cross-talk can be carried out on them.
  10. https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_050712.txt

    https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_050712.txt
    14 Jul 2005: coaveraging with fewer dithers). MJI will attempt some tests on the existing data to mimic this latter strategy and cf. ... STH finish the 3 remaining RIXs in the ETC document MJI raise calibration frame issue at next VDMT STH test test version of the
  11. VDFS UK VISTA User Requirements

    https://people.ast.cam.ac.uk/~wfcam/docs/vdfs/vdfs_uk-vista-user-req_v2.pdf
    6 May 2005: Cf [RD05] Sec 4.8. Comment: This enables mapping of photometry vs position on the focal plane, which can test (for example) residual gradients due to scattered light, varying aperture correction
  12. https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_051024.txt

    https://people.ast.cam.ac.uk/~wfcam/docs/minutes/minutes_051024.txt
    26 Oct 2005: does cross-talk correction JRL arranged the next JAC telecon (see item 4) MR set up a test harness using some of the data from 8th April. ... Neither was fully readable. Further tests (eg. returned to sender) are being pursued.

Refine your results

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.