Search

Search Funnelback University

Search powered by Funnelback
1 - 10 of 10 search results for Economics assesment |u:www.cdbb.cam.ac.uk where 0 match all words and 10 match some words.
  1. Results that match 1 of 2 words

  2. PowerPoint Presentation

    https://www.cdbb.cam.ac.uk/files/060521_gsl_navigator.pdf
    6 May 2021: 2.6 Develop an environmental management plan and establish. environmental targets. 2.10 Develop targets for economic, security, functional and. ... management plan and establish. environmental targets. 2.10 Develop targets for economic,.
  3. CRT135218A CDBB - Economics of Digital in Construction_v16.3

    https://www.cdbb.cam.ac.uk/files/20210608_cdbb_econ_value_of_im_kpmg-atkins_report_infographic_1_pager_final.pdf
    8 Jun 2021: Leading to an increase in wages across the economy. The value of Information Management in the construction and infrastructure sector. The construction sector’s historic productivity challenges means building and maintaining the country’s built
  4. MARGIN CR OP M AR KS MA RG IN ...

    https://www.cdbb.cam.ac.uk/files/cdbb_econ_value_of_im_exec_summary.pdf
    10 Jun 2021: report. The economic analysis contained in this report is for. indicative purposes only. ... have significant implications for the economic. wellbeing of customers (end users of assets), wider.
  5. Modelling across the built and natural environment…

    https://www.cdbb.cam.ac.uk/files/workshop_report_290521v2.pdf
    17 Jun 2021: twins. However, they have integrated more with socio-economic modelling, an area that could have profound benefits in planning, designing and operating the built environment.
  6. The Digital Innovation ImperativeAdvancing progress towards a digital …

    https://www.cdbb.cam.ac.uk/files/digital_innovation_imperative_140921.pdf
    14 Sep 2021: way we design, build, operate and integrate our. physical, social and economic infrastructure and. ... age, demographics, economic or other factors. Many projects, including London’s Digital Exclusion.
  7. BIM in Local Authorities A paper discussing the issues ...

    https://www.cdbb.cam.ac.uk/files/111120_bim_in_la.pdf
    16 Jul 2021: Given the economic environment at the inception of the BIM programme, there was a focus on using BIM as a way of driving cost down in the capital delivery phase of
  8. Line of Sight: an Asset Management Methodology to Support ...

    https://www.cdbb.cam.ac.uk/files/line_of_sight_july_2021.pdf
    8 Jul 2021: It states: “The total economic value of Highways England is £311bn – this includes £115bn of physical asset value (the strategic road network) and £196bn of value created by users of the
  9. PowerPoint Presentation

    https://www.cdbb.cam.ac.uk/files/cdbb_dt_navigator_with_links_11.05.2021.pdf
    11 May 2021: smarter, and work as an optimised system in order to help relieve the pressures put upon it from increasing population, economic growth and climate change. ... Evolving strategic case;• Proposed economic and financial case;• Management case
  10. An integrated approach to information managementIdentifying decisions …

    https://www.cdbb.cam.ac.uk/files/process_model.pdf
    15 Apr 2021: Dictionary definitions1 typically include this but admit other uses (e.g. sports activity, terrorist activity, economic activity and “all human activity” are all allowable uses).
  11. The value of Information Management in the construction and ...

    https://www.cdbb.cam.ac.uk/files/20210616_cdbb_econ_value_of_im_kpmg-atkins_report_case_study_annex_final.pdf
    16 Jun 2021: The economic analysis contained in this Case Study Annex report is for indicative purposes. ... state whether, in the economic analysis presented, the items that have been included are.

Refine your results

clear all

Format

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.