Search

Search Funnelback University

Search powered by Funnelback
Did you mean economiccosts |d=2015?
41 - 50 of 219 search results for economic cost |d=2015 where 93 match all words and 126 match some words.
  1. Fully-matching results

  2. Cambridge University Reporter No 6383 for Wednesday 22 April 2015,…

    https://www.reporter.admin.cam.ac.uk/reporter/2014-15/weekly/6383/6383.pdf
    30 Apr 2015: 7. In the medium‑term it is intended that the operational costs of the facilities will be met, on a Full Economic Costing basis, through charges to animal users. ... and run to meet the University’s research objectives on a cost‑effective and
  3. Cambridge University Reporter No 6374, Wednesday 4 February 2015, vol …

    https://www.reporter.admin.cam.ac.uk/reporter/2014-15/weekly/6374/6374.pdf
    23 Feb 2015: Funding is also in place to equip the refurbished facility. No significant incremental running costs are anticipated for the new facilities. ... Natural Sciences Tripos, Part II (Biological and Biomedical Sciences), 2015–16. Faculty of Economics:
  4. Proposed Environmental Sustainability Vision, Policy and Strategy

    https://www.reporter.admin.cam.ac.uk/reporter/2014-15/weekly/6384/Environmental-Strategy.pdf
    29 Apr 2015: 7.2. The operational costs associated with energy and water use are invisible to institutions and individuals. ... Recommendation 5: True costs of building construction and operations should ultimately be visible and accountable at an institutional level.
  5. Magdalene Mattersthe newsletter of Magdalene College Cambridge…

    https://www.magd.cam.ac.uk/system/files/2017-08/magdalene_matters_issue_42_0.pdf
    23 Nov 2015: years. Simple cleaning of a rare and precious book costs about £20–30, while conservation by an experienced conservator of a damaged or fragile item can cost between £450 and ... one of my main concerns before starting University was the cost of
  6. Biannual Research Report November 2014 — April 2015 University ...

    https://www.cares.cam.ac.uk/wp-content/uploads/2018/11/2nd-Biannual-Research-Report.pdf
    12 May 2015: liverables that improve the economic and environmental performance of both existing and new. ... pH 10. This approach suggests a disposable, reproducible, low-cost method for pH sensing with the.
  7. QUEENS’ COLLEGE, CAMBRIDGE

    https://www.queens.cam.ac.uk/sites/www.queens.cam.ac.uk/files/downloads/accounts_annual_report_14-15_final.pdf
    6 Oct 2015: Excluding the costs of research, which are met through dedicated income streams, the balance of £2,063,810 is equal to c£4,100 per undergraduate, being 48% of the total cost. ... Buildings under construction are valued at cost, based on the value of
  8. Cambridge University Reporter, Special No 6, 2015-16, Financial…

    https://www.reporter.admin.cam.ac.uk/reporter/2015-16/special/06/06-FMI-2015-SectionC.pdf
    22 Dec 2015: Costs by activity (£000) 2014-15 Costs by type (£000) 2014-15Research Administration Other Total costs Total costs. ... Section C Page 19. Costs by activity (£000) 2014-15 Costs by type (£000) 2014-15Research Administration Other Total costs Total
  9. Biannual Research Report November 2014 — April 2015 University ...

    https://intranet.cares.cam.ac.uk/wp-content/uploads/2018/11/Biannual-Research-Report-Apr-2015-CMYK-mk.pdf
    23 May 2015: vity and conversion. Such improvements will provide a reduced carbon footprint and energy demand for both established and new processes. Lowering the cost of CO2 capture, ... de‐liverables that improve the economic and envir
  10. Cambridge University Reporter for Wednesday 18 February 2015, vol 145 …

    https://www.reporter.admin.cam.ac.uk/reporter/2014-15/weekly/6376/6376.pdf
    18 Feb 2015: 4. The total cost of the project has been estimated at approximately £22.7m. ... 2014. The total cost of the development proposals in Tennis Court Road has been estimated at approximately £31.9m.
  11. Cambridge University Reporter 6386 - 13 May 2015

    https://www.reporter.admin.cam.ac.uk/reporter/2014-15/weekly/6386/6386.pdf
    22 May 2015: The cost of the facility is estimated at £104.6m. These costs are based on the assumption that construction will commence in late 2015 and all works will be completed by ... Recurrent costs will be met in full by the bodies which fund the research in

Refine your results

clear all

Format

Date

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.