Search
Search Funnelback University
- Refined by:
- Date: 2001
41 -
60 of
72
search results for Economics assesment
where 0
match all words and 72
match some words.
Results that match 1 of 2 words
-
LectList2001
https://www.reporter.admin.cam.ac.uk/reporter/2001-02/special/01/p115-118.pdf28 Sep 2001: DEAKIN, MRS S. FENNELL ANDPROF. R. ROWTHORN. Economics of Law and Regulation. ... M. 4–6. MR D. BETHLEHEMThe WTO and International Economic Law. F. -
Process Encyclopaedia
www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/polymer_extrusion.html8 Sep 2001: Near-net-shape process, only the ends of the extrusion are wasted. Economics. ... Because of the high costs, it is usually only economic to produce lengths over 10km - although there is little competition for many of the possible shapes. -
LectList2001
https://www.reporter.admin.cam.ac.uk/reporter/2001-02/special/01/p213-223.pdf28 Sep 2001: C O M P U L S O RY PA P E R SPaper S1 (Foundations of Social Anthropology I: Kinshipand Economics). ... SSORIN-CHAIKOV(Seminar) Anthropology and the Study of. Economics M. 3.30–5 (weeks 1–8) DR N. -
OrdersText01.qk
https://www.reporter.admin.cam.ac.uk/reporter/2000-01/special/15/1.pdf24 May 2001: Quantitative economics. Economics Qualifying Examination in Elementary Mathematics, Easter Term2001 – ECQ1The examination will take place in the Examination Halls, New Museums Site. ... Economic development. Lady Mitchell Hall. Economics Tripos, Part II -
Process Encyclopaedia
www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/lost_wax_casting.html8 Sep 2001: Economics. The production cycle is slow: usually only 1-5 castings can be made an hour, depending on the size. ... Although the setup costs are low, the low manual production rate means that only batch sizes of up to 50 are economic; this can rise to a -
LectList2001
https://www.reporter.admin.cam.ac.uk/reporter/2001-02/special/01/p239.pdf28 Sep 2001: RENWICK, MRS M. GARDINER AND DR T. GOESCHL(Sixteen lectures). Paper 5 Environmental Economics, Law and PolicyDR I. -
Process Encyclopaedia
www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/joining.html8 Sep 2001: In addition to these processes, there are a variety of "hot processes" such as welding and brazing which can often provide stronger and more economic joints for metal parts. -
LectList2001
https://www.reporter.admin.cam.ac.uk/reporter/2001-02/special/01/symbols.pdf28 Sep 2001: Education Ling Linguistics SPS Social and Political SciencesEP Economics and Politics Math Mathematics. -
Process Encyclopaedia
www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/rotational_moulding.html8 Sep 2001: Economics. Cycle time is limited by heat conduction out of the mould, so increases dramatically for larger wall thicknesses. ... The long cycle times usually limit economic batch sizes to between 500 and 10,000. -
Student Number 2001
https://www.reporter.admin.cam.ac.uk/reporter/2000-01/special/19/studentnumber2001.pdf20 Aug 2001: Economics 29 10 39 — — —M.Phil. Economics and Development 3 2 5 — — —M.Phil. ... Economics with Finance 6 1 7 — — —M.Phil. Education 16 26 42 — — —M.Phil. -
Process Encyclopaedia
www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/drilling.html8 Sep 2001: Economics. It is normal to try to reduce the amount of drilling required in a component by careful design - but when an accurate hole is required, drilling has little competition. -
Easter2001
https://www.reporter.admin.cam.ac.uk/reporter/2000-01/special/17/3.pdf4 Jul 2001: GoodwillGoodwill relating to investments made by the Group is amortized over ten years on a straight line basis, being itsestimated useful economic life. -
Process Encyclopaedia
www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/injection_moulding.html8 Sep 2001: Economics. To reduce costs, several parts are often moulded together on a "tree-like" structure; parts can then be separated after moulding. ... Injection moulding is only economic for batches of 10,000 - 100,000 or more and so is usually automated. -
Process Encyclopaedia
www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/compression_moulding.html8 Sep 2001: Economics. Cycle time is limited by heat transfer, or curing time and is usually over 1 minute. ... The low production rate means that it is only usually economic for batch sizes in the tens of thousands. -
Process Encyclopaedia
www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/turning.html8 Sep 2001: Economics. The use of dedicated lathes for metal turning is rare on an industrial scale, except for prototyping. -
Process Encyclopaedia
www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/mechanical_fastening.html8 Sep 2001: Economics. Can be economic for any batch size from one-offs to mass production (with or without automation). -
Process Encyclopaedia
www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/grinding.html8 Sep 2001: Economics. On an industrial scale, the wear on grinding equipment is significant and this adds greatly to the cost. -
Process Encyclopaedia
www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/forging.html8 Sep 2001: Economics. Production rate is limited by the insertion and removal of the blank, so some form of automation is often used. -
Lecture List, Lent Term 2001: Additions and Corrections
https://www.reporter.admin.cam.ac.uk/reporter/2000-01/special/09/1.pdf12 Jan 2001: Th. 3–5 L. T. DIPLOMA IN ECONOMICS CLASSES. (Paper 1) MicroeconomicsMR C. ... Eight lectures)Tu. 12. British economic and social history, 1450–1750 (Paper 9)DR R. -
Process Encyclopaedia
www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/blow_moulding.html8 Sep 2001: Economics. The production speed is limited by opening and closing the mould, so automation is normally used.
Search history
Recently clicked results
Recently clicked results
Your click history is empty.
Recent searches
Recent searches
Your search history is empty.