Search

Search Funnelback University

Search powered by Funnelback
1 - 20 of 21 search results for news |u:www.westcambridge.co.uk
  1. Fully-matching results

  2. Slide 1

    https://www.westcambridge.co.uk/files/20171115_wccg_cav_sfh_web.pdf
    16 Nov 2017: Health and Well Being considered in the designs. • Both schemes designed to reflect the new vision for the West Cambridge Site.
  3. Slide 1

    https://www.westcambridge.co.uk/files/170320_wccf_presentation_web.pdf
    7 Apr 2017: Viewpoint 6 – Wilberforce Road – Submitted (June 2016) view with new LiDAR Data. ... Viewpoint 7 – Dane Drive – Submitted (June 2016) view with new LiDAR Data.
  4. University of Cambridge West Cambridge Community Group Minutes of ...

    https://www.westcambridge.co.uk/files/161114_wccg_mins.pdf
    24 Jan 2017: Where a new document has been revised we will include that commentary (Jim Strike). ... John Hopkins). We have started a new relationship with Whippet and we can reflect on this with the Travel Plan Manager.
  5. University of Cambridge West Cambridge Community Group Minutes of ...

    https://www.westcambridge.co.uk/files/170321_wccg_mins_final.pdf
    10 May 2017: Q: At the New Museums Site the arrival of the canteen was good but the food vans are also welcome by staff – will they be on campus or not and are
  6. Cavendish III

    https://www.westcambridge.co.uk/files/2768-community_consultation_compiled_web.pdf
    6 Apr 2017: DRAF. T. for C. onsu. ltatio. n. 24. Noise Impact. Noise break out from new operational plant to the environment:. • ... n. 31. University of Cambridge Amenities Strategy. “The University proposes a new model.
  7. DRAF T for co nsult ation The HubUniversity of ...

    https://www.westcambridge.co.uk/files/170719_shared_facilities_presentation-_web_2.pdf
    28 Jul 2017: A landmark building offering a variety of shared spaces. • A new collaborative resource for all West Cambridge users and Cambridge Community beyond. • ... JJ Th. omso. n Ave. nue. existing buildings (retained). new development.
  8. Jim Strike Letter John Evans 2017-10-10

    https://www.westcambridge.co.uk/files/01_171010_wc_supplementarysubmission_coveringletter.pdf
    10 Oct 2017: aecom.com. 1/4. John Evans New Neighbourhoods Planning Services Cambridge City Council Guildhall Market Square Cambridge CB2 3QJ. ... Original Document Supplementary Submission Document. Nature of Update. Previous Revision. New Revision Purpose of
  9. Slide 1

    https://www.westcambridge.co.uk/files/171115_wccf_presentation_web.pdf
    16 Nov 2017: 10. Energy Statement Addendum. 11. Revised Sustainability Appraisal Matrix. New Documents 1. ... connections to Milton Park and Ride 18) Contributions to Madingley Mulch Park and Ride and connections (delivered by the Greater Cambridgeshire Partnership)
  10. University of Cambridge West Cambridge Community Group Minutes of ...

    https://www.westcambridge.co.uk/files/170719_wccg_minutes_final.pdf
    28 Jul 2017: The plans include access to the site from Clerk Maxwell Road to the new development site.
  11. AECOM Blank

    https://www.westcambridge.co.uk/files/11_20170817_westcambs_servicing_technical_note.pdf
    18 Sep 2017: Updates will reference new buildings and any particular amenity issues that need to be managed to ensure the amenity of neighbouring properties is protected.
  12. SEP T EM BER 2017 OU T LINE PL ...

    https://www.westcambridge.co.uk/files/06_20170906_west_cambridge_masterplan_es_volume_1_nts.pdf
    18 Sep 2017: New EIA. Regulations (The Town and County Planning (Environmental Impact Assessment) Regulations 2017) have. ... Careful specification and design of new lighting and removal of some existing lighting;. •
  13. UNIVERSIT Y OF CAMBRIDGE JULY 2016 OU T LINE ...

    https://www.westcambridge.co.uk/files/15_20160720_west_cambridge_heritage_assessment.pdf
    18 Sep 2017: At the southern end of the ground floor corridor a new glazed brick curved wall has been added. ... 12 Building description. Figure 4.9 Vet School Teaching Block, library, showing altered configuration with new first floor and staircase.
  14. SEP T EM BER 2017 OU T LINE PL ...

    https://www.westcambridge.co.uk/files/03_170914_revised_parameter_statement.pdf
    14 Sep 2017: The development will introduce new faculty and research and development buildings, as well as related commercial research and development organisations onto the site. ... The zones within which new Secondary Streets may be constructed are shown on
  15. September 2017 Page 1 of 10 SAM spreadsheet version ...

    https://www.westcambridge.co.uk/files/14_sam_spreadsheet_version_05c.pdf
    14 Sep 2017: Requirements for new site wide infrastructure and phasing• Performance standards for infrastructure and connection requirements for future and existing buildings. • ... Provide improved bus links with access to the Cambridge Rail Station and new
  16. Jonny Hill Report West Cambridge Outline Planning Application…

    https://www.westcambridge.co.uk/files/02_171010_west_cambs_planning_statement_addendum.pdf
    10 Oct 2017: Emerging Policy 57 ‘Designing new buildings’. 3.3.2 Assessment of Amended Proposed Development. ... parking redeveloped for new facilities and development fronting onto streets and new public spaces.
  17. Blank FM document

    https://www.westcambridge.co.uk/files/13_170619_energy_strategy_addendum_technical_note.pdf
    18 Sep 2017: Cluster 5 is mainly built already, but adding new building later may allow a local network to be established.
  18. STRATEGY DESIGN DOCUMENT 13092017

    https://www.westcambridge.co.uk/files/16_west_cambridge_public_art_strategy.pdf
    18 Sep 2017: is encouraged through shared public open space and a new legibility through the site. ... Commission of new work from artists/creative. - Commission of new work from artists/creative practitioners (4 per season). -
  19. PROPOSED RE-GRADING MEETSEXISTING BASIN INVERT AT THIS POINT FLOW ...

    https://www.westcambridge.co.uk/files/31500_-_flood_risk_assesment_20170630_part_11.pdf
    25 Sep 2017: NEW OUTFALL TO BECONSTRUCTED IL 11.65. NEW OUTFALL TOCANAL IL 13.00. ... NEW OUTFALL TOPOND IL 13.00. STORAGE FEATURE EXISTING STORAGEVOLUME (m). PROPOSED STORAGEVOLUME (m).
  20. Other Reports Template

    https://www.westcambridge.co.uk/files/09_170915_-_revised_transport_assessment_part1.pdf
    17 Oct 2017: Figure 6.9 - Madingley Road - High Cross – New Junction. ... It is within this context that the University of Cambridge is producing a new masterplan for the Site which significantly increases the amount of development to approximately 500,280m2.
  21. SEP T EM BER 2017 OU T LINE PL ...

    https://www.westcambridge.co.uk/files/08_20170912_west_cambridge_masterplan_es_volume_3_appendices_addendum_part1.pdf
    16 Oct 2017: Appendix 8.4 – Woodland management plan – This is a new appendix which did not form part of the. ... Appendix 10.4 – TEMPRO growth factors for the Cambridge area – This is a new appendix which did.

Refine your results

clear all

Format

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.