Search

Search Funnelback University

Search powered by Funnelback
11 - 20 of 21 search results for news |u:www.westcambridge.co.uk
  1. Fully-matching results

  2. SEP T EM BER 2017 OU T LINE PL ...

    https://www.westcambridge.co.uk/files/06_20170906_west_cambridge_masterplan_es_volume_1_nts.pdf
    18 Sep 2017: New EIA. Regulations (The Town and County Planning (Environmental Impact Assessment) Regulations 2017) have. ... Careful specification and design of new lighting and removal of some existing lighting;. •
  3. UNIVERSIT Y OF CAMBRIDGE JULY 2016 OU T LINE ...

    https://www.westcambridge.co.uk/files/15_20160720_west_cambridge_heritage_assessment.pdf
    18 Sep 2017: At the southern end of the ground floor corridor a new glazed brick curved wall has been added. ... 12 Building description. Figure 4.9 Vet School Teaching Block, library, showing altered configuration with new first floor and staircase.
  4. SEP T EM BER 2017 OU T LINE PL ...

    https://www.westcambridge.co.uk/files/03_170914_revised_parameter_statement.pdf
    14 Sep 2017: The development will introduce new faculty and research and development buildings, as well as related commercial research and development organisations onto the site. ... The zones within which new Secondary Streets may be constructed are shown on
  5. September 2017 Page 1 of 10 SAM spreadsheet version ...

    https://www.westcambridge.co.uk/files/14_sam_spreadsheet_version_05c.pdf
    14 Sep 2017: Requirements for new site wide infrastructure and phasing• Performance standards for infrastructure and connection requirements for future and existing buildings. • ... Provide improved bus links with access to the Cambridge Rail Station and new
  6. Jonny Hill Report West Cambridge Outline Planning Application…

    https://www.westcambridge.co.uk/files/02_171010_west_cambs_planning_statement_addendum.pdf
    10 Oct 2017: Emerging Policy 57 ‘Designing new buildings’. 3.3.2 Assessment of Amended Proposed Development. ... parking redeveloped for new facilities and development fronting onto streets and new public spaces.
  7. Blank FM document

    https://www.westcambridge.co.uk/files/13_170619_energy_strategy_addendum_technical_note.pdf
    18 Sep 2017: Cluster 5 is mainly built already, but adding new building later may allow a local network to be established.
  8. STRATEGY DESIGN DOCUMENT 13092017

    https://www.westcambridge.co.uk/files/16_west_cambridge_public_art_strategy.pdf
    18 Sep 2017: is encouraged through shared public open space and a new legibility through the site. ... Commission of new work from artists/creative. - Commission of new work from artists/creative practitioners (4 per season). -
  9. PROPOSED RE-GRADING MEETSEXISTING BASIN INVERT AT THIS POINT FLOW ...

    https://www.westcambridge.co.uk/files/31500_-_flood_risk_assesment_20170630_part_11.pdf
    25 Sep 2017: NEW OUTFALL TO BECONSTRUCTED IL 11.65. NEW OUTFALL TOCANAL IL 13.00. ... NEW OUTFALL TOPOND IL 13.00. STORAGE FEATURE EXISTING STORAGEVOLUME (m). PROPOSED STORAGEVOLUME (m).
  10. Other Reports Template

    https://www.westcambridge.co.uk/files/09_170915_-_revised_transport_assessment_part1.pdf
    17 Oct 2017: Figure 6.9 - Madingley Road - High Cross – New Junction. ... It is within this context that the University of Cambridge is producing a new masterplan for the Site which significantly increases the amount of development to approximately 500,280m2.
  11. 2031 AM Peak 3-hr Potential Users Current Modelled Mode ...

    https://www.westcambridge.co.uk/files/09_170915_-_revised_transport_assessment_part_5.pdf
    17 Oct 2017: completion of new car parking spaces;. - proposed building floor space changes;. -

Refine your results

clear all

Format

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.