Search

Search Funnelback University

Search powered by Funnelback
11 - 20 of 43 search results for Economics test |u:www-civ.eng.cam.ac.uk where 1 match all words and 42 match some words.
  1. Results that match 1 of 2 words

  2. Database of closed-ended piles in sand: a comparison of qc and qb

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR327.pdf
    15 May 2003: This paper is concerned only with closed-ended piles in sand, for which field load test data from 28 pile tests at 12 sites was collated by Chow. ... Test 6C was hammer driven. The tests were conducted with the tip of the pile at a shallow embedment into
  3. Yetginer_BGApaper

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/131_BGA_2003_963_974.pdf
    22 May 2003: Table 1: Schedule of tests at Takasu Test Site. The load tests were continued until a settlement of D/4=25mm was reached. ... Circular Twelve Pile Group. P12 128.5. 600 (50). Table 2: Results of load tests at Takasu Test Site.
  4. March 12, 2003 11:8 Proceedings of OMAE’0322nd International…

    www-civ.eng.cam.ac.uk/dsl/publications/OMAE2003-37465.pdf
    14 Mar 2003: Fi-nally, test solutions obtained for various cable configurations willbe compared to that of time domain and conclusions drawn. ... 6 Copyright c 2003 by ASME. Test Data Units Cable 6 Cable 7.
  5. April 30, 2003 18:33 Proceedings of OMAE’0322nd International…

    www-civ.eng.cam.ac.uk/dsl/ppao2/documents/OMAE2003-37465.pdf
    22 May 2003: Fi-nally, test solutions obtained for various cable configurations willbe compared to that of time domain and conclusions drawn. ... 6 Copyright c 2003 by ASME. Test Data Units Cable 6 Cable 7.
  6. A novel urban foundation system using pressed-in H-piles

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/130_ECSMGE_2003_vol2_425_430.pdf
    30 Aug 2003: A total of four load tests were carried out, of which test nos. ... Table 1. Shinagawa load tests results Test No. 1 No. 3 No.
  7. GROUND-BORNE VIBRATIONS DUE TO PILING OPERATIONS

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/132_BGA_2003_743_756.pdf
    3 Mar 2003: 1 Takasu test-site, Kochi Japan. July 2002. Made ground overlying silty sand. ... 3 Takasu test-site, Kochi Japan. July 2002. Made ground overlying silty sand.
  8. Enginuity July 2003

    www-civ.eng.cam.ac.uk/dsl/enginuity.pdf
    10 Sep 2003: We allknow that engineers should have a knowledgeof economics, but Phillips made an enormouscontribution and showed that economists couldlearn much from engineering!
  9. How unsafe the JRA (1996) code is

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR328.pdf
    14 Oct 2003: PILE BUCKLING IN A CENTRIFUGE TEST. Dynamic centrifuge tests were carried out at Cambridge Geotechnical Research Group to verify if. ... stiffness. Table 2: Summary of the centrifuge tests. Test ID Pile ID.
  10. 16 Oct 2003: 1987; Russo et al. 1991!, but remains empirical. It isbased on tests using steel-reinforced concrete, and thus cannodirectly applied to FRP-reinforced concrete. ... A small number of tests have been carried outestablish equivalent constitutive equations
  11. D:\Papers\Vibration wrinkled membranes SDM\SDM_Paper_2003.dvi

    www-civ.eng.cam.ac.uk/dsl/publications/Vibration_wrinkled_membranes_SDM.pdf
    14 Feb 2003: Twotypes of vibration tests were carried out: (i) a linearidentification test using slow sine sweep and constantsine excitation, and (ii) a nonlinear identification testusing slow sine sweep excitation. ... A Polytec PSV300scanning laser vibrometer was

Refine your results

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.