Search

Search Funnelback University

Search powered by Funnelback
41 - 50 of 63 search results for Economics middle test |u:www.phase-trans.msm.cam.ac.uk where 7 match all words and 56 match some words.
  1. Results that match 2 of 3 words

  2. RECENT DEVELOPMENTS IN THE USE OF QUENCHED AND SELF-TEMPERED ...

    www.phase-trans.msm.cam.ac.uk/2005/LINK/112.pdf
    7 Jun 2010: 4). Tests performed in Hong Kong have confirmed the safe behaviour of HISTAR bearing piles during installation with heavy diesel and hydraulic impact hammers as well as during static test loadings ... Full-scale tests performed with S460 quality [22] as
  3. 1 EFFECT OF NB IN SOLID SOLUTION ON THE ...

    www.phase-trans.msm.cam.ac.uk/2005/LINK/106.pdf
    7 Jun 2010: Then, in the last stage of the tests, the samples were cooled down to room temperature at 5C/sec. ... reaction. In spite of that, it was possible to keep a constant cooling rate of 5C/sec in this test.
  4. paper46

    www.phase-trans.msm.cam.ac.uk/2005/LINK/46.pdf
    7 Jun 2010: The delivery conditions in EN 10149 do not include a mandatory test of impact energy. ... Test specimen “O“. Test specimen “S“. Fig.10. Structural detailing and large scale specimens.
  5. THE DESIGN OF X80 TO X120 STEELS WITH INCREASED ...

    www.phase-trans.msm.cam.ac.uk/2005/LINK/119.pdf
    7 Jun 2010: Additional details can be found in [6]. In all corrosion tests the pH was continually monitored throughout each test run and was controlled by the partial pressure of the CO2, this ... The test temperature was maintained at 303K (30oC) throughout. In
  6. The use of very high strength steels

    www.phase-trans.msm.cam.ac.uk/2005/LINK/189.pdf
    7 Jun 2010: These calcu-lative values RK are in competition with those from direct experimental tests. ... 1. lower shelf region, where the load-deformation characteristic of test pieces in.
  7. no_62_Ardehali Barani_2

    www.phase-trans.msm.cam.ac.uk/2005/LINK/62.pdf
    7 Jun 2010: Tensile tests were performed at room temperature. Sample for microstructure investigations were cut and prepared using standard grinding and polishing techniques. ... The deformation strain of 0.4 and strain rate of 5s-1 were kept constant for all tests.
  8. 050821_Manuskript_SHHS

    www.phase-trans.msm.cam.ac.uk/2005/LINK/13.pdf
    7 Jun 2010: Fig. 5 Fatigue test results. The tests under variable amplitude loading were carried out with a base Gaussian spectrum and a base Gaussian spectrum superimposed with Gaussian distributed overloads, Fig. ... 10. FRACTURE MECHANICAL TESTS For the base
  9. THE TAP PROJECT F. Marchesani, E. Donati – Snamprogetti, ...

    www.phase-trans.msm.cam.ac.uk/2005/LINK/186.pdf
    7 Jun 2010: CP). Pipe and cool bending Pipe and hot bendingBurst test pipes (110 m). ... has been used to perform the first long term full scale test in environment.
  10. THE DEVELOPMENT OF ULTRAHIGH STRENGTH WIRE Shaun Hobson – ...

    www.phase-trans.msm.cam.ac.uk/2005/LINK/6.pdf
    7 Jun 2010: Table 6 Galvanised Wire Properties. Coil No. No of Tests, n UTS, MPa. ... To test this assumption two full- scale fatigue tests were completed utilising two different mean load conditions (20% & 30% of the cable MBL) with a fluctuating load of /-10% MBL.
  11. 103 Materials development for boilers and steam turbines o–

    www.phase-trans.msm.cam.ac.uk/2005/LINK/103.pdf
    7 Jun 2010: constituents. The tests used an atmosphere of 15 vol % CO2 10 vol % H2O 1 vol % SO2 with balance N2 , and the test specimens were coated with a synthetic coal ash, K2SO4 ... A large creep test matrix is presently underway covering two major test

Refine your results

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.