Search

Search Funnelback University

Search powered by Funnelback
21 - 30 of 38 search results for Economics assesment |u:www-materials.eng.cam.ac.uk where 0 match all words and 38 match some words.
  1. Results that match 1 of 2 words

  2. Process Encyclopaedia

    www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/drilling.html
    8 Sep 2001: Economics. It is normal to try to reduce the amount of drilling required in a component by careful design - but when an accurate hole is required, drilling has little competition.
  3. Process Encyclopaedia

    www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/grinding.html
    8 Sep 2001: Economics. On an industrial scale, the wear on grinding equipment is significant and this adds greatly to the cost.
  4. Process Encyclopaedia

    www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/blow_moulding.html
    8 Sep 2001: Economics. The production speed is limited by opening and closing the mould, so automation is normally used.
  5. Process Encyclopaedia

    www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/turning.html
    8 Sep 2001: Economics. The use of dedicated lathes for metal turning is rare on an industrial scale, except for prototyping.
  6. Process Encyclopaedia

    www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/powder_metal_forming.html
    8 Sep 2001: filter, bearings). Economics. The machinery is expensive, and can cost well over £100,000. ... Tends only to be economic for large batches (50,000+) or processing high-strength alloys.
  7. Process Encyclopaedia

    www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/vacuum_forming.html
    8 Sep 2001: Economics. Cycle time is limited by heating and cooling of the sheet.
  8. Process Encyclopaedia

    www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/glass_moulding.html
    8 Sep 2001: Economics. Production rates and costs strongly depend on the type of process and the size of component.
  9. Process Encyclopaedia

    www-materials.eng.cam.ac.uk/mpsite/process_encyc/non-IE/rotational_moulding.html
    8 Sep 2001: Economics. Cycle time is limited by heat conduction out of the mould, so increases dramatically for larger wall thicknesses. ... The long cycle times usually limit economic batch sizes to between 500 and 10,000.
  10. Product Analysis

    www-materials.eng.cam.ac.uk/mpsite/tutorial/non_IE/prodanal.html
    20 Jan 2000: Every product is designed in a particular way - product analysis enables us to understand the important materials, processing, economic and aesthetic decisions which are required before any product can be manufactured. ... Choose a suitable process that
  11. Walking Aids Case Study

    www-materials.eng.cam.ac.uk/mpsite/short/OCR/walking_aids/default.html
    4 Sep 2001: It is not economic to use standard processes such as turning - so another approach is needed.

Refine your results

Date

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.