Search

Search Funnelback University

Search powered by Funnelback
11 - 16 of 16 search results for Economics Curriculum |u:intranet.cares.cam.ac.uk where 0 match all words and 16 match some words.
  1. Results that match 1 of 2 words

  2. Biannual Research Report May—September 2014 University of Cambridge…

    https://intranet.cares.cam.ac.uk/wp-content/uploads/2018/10/biannual_research_report_-_compressed.pdf
    22 Oct 2014: economic and environmental performance of both existing and new processes. MUSCAT was originally comprised of six work packages. ... In particular, work has continued on the concepts of ‘quadratic dissipativity’ and ‘asymptotic quadratic
  3. CARES Financial Policy draft v7 (GB20)_revised

    https://intranet.cares.cam.ac.uk/wp-content/uploads/2023/01/CARES-Financial-Policy-v7.pdf
    17 Jan 2023: Page 1 of 5 0 . Cambridge Centre for Advanced . Research and Education Ltd . Financial Policies and Procedures . Version 7 . Version control . Version number  Approved by CARES Governing Board (date). 1  1st Nov 2016 2 
  4. CAMBRIDGE CARES Biannual Research Report November 2018 - March ...

    https://intranet.cares.cam.ac.uk/wp-content/uploads/2019/04/10th-Biannual-Research-Report.pdf
    26 Apr 2019: of a chemical plant with the goal of improving. the overall economics on the entity. ... are minimised while economic output is maxim-. ised. Members of the JPS team use the J-Park Simulator.
  5. Biannual Research Report November 2014 — April 2015 University ...

    https://intranet.cares.cam.ac.uk/wp-content/uploads/2018/11/Biannual-Research-Report-Apr-2015-CMYK-mk.pdf
    23 May 2015: de‐liverables that improve the economic and environmental performance of both exis ng and new processes . MUSCAT is led by PIs:. Prof John DENNIS (Cam). Prof Yanhui YANG (NTU).
  6. Page 1 of 43 Cambridge Centre for Advanced Research ...

    https://intranet.cares.cam.ac.uk/wp-content/uploads/2019/08/02-CARES-Financial-Policy-v3-confirmed.pdf
    14 Aug 2019: Page 1 of 43. Cambridge Centre for Advanced. Research and Education Ltd. Financial Policies and Procedures. Version 3. Version control. Version number Approved by CARES Governing Board (date). 1 1st Nov 2016 2 21st March 2018 3 22nd May 2019. Page 2
  7. Page 1 of 43 Cambridge Centre for Advanced Research ...

    https://intranet.cares.cam.ac.uk/wp-content/uploads/2019/11/02-CARES-Financial-Policy-proposed-v4-approved.pdf
    29 Nov 2019: Page 1 of 43. Cambridge Centre for Advanced. Research and Education Ltd. Financial Policies and Procedures. Version 4. Version control. Version number Approved by CARES Governing Board (date). 1 1st Nov 2016 2 21st March 2018 3 22nd May 2019. 4 27th

Refine your results

Format

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.