Search

Search Funnelback University

Search powered by Funnelback
31 - 40 of 231 search results for KaKaoTalk:ZA31 24 24 |u:www-civ.eng.cam.ac.uk where 0 match all words and 231 match some words.
  1. Results that match 1 of 2 words

  2. Burgoynefinal2

    www-civ.eng.cam.ac.uk/cjb/papers/cp91.pdf
    8 Apr 2011: Careful choice of temperature step and step duration allow the test to be completed in about 24 hours. ... van Leeuwen J. and Siemes A.J.M. (1979). Miner's rule with respect to plain concrete, Heron, 24(1),1–34 Yamaguchi, T., Kato Y., Nishimura T.
  3. Durability and Mechanical Properties of Deep-Mixed Clays

    www-civ.eng.cam.ac.uk/geotech_new/publications/abstracts/abst-osman_abir.html
    10 Jul 2007: Furthermore, allowing the bentonite to hydrate for 24 hours or using a high shear mixer to mix the bentonite yielded much higher strengths and lower permeabilities at all ages for the
  4. ACM-186

    www-civ.eng.cam.ac.uk/cjb/papers/cp67.pdf
    20 Jul 2004: The motorway has 3 lanes in each direction, of which 2 were assumed closed between 0:00-6:00 and 19:00-24:00, and one from 6:00-16:00, ... 5. 0 5 10 15 20 24. -4.5. -4. -3.5. -3.
  5. E:CURRENT_WORKCRTS TECHNOLOGYREPORT.DVI

    www-civ.eng.cam.ac.uk/dsl/publications/TR195.pdf
    5 Apr 2001: Configuration 12 13.4. 24 3.6. Circular 6 45.9. Configuration 12 12.5. ... apertures of 1, 3, 5, and 10 m, with 6, 12, and 24 ribs.
  6. FRPRCS-8 Full Paper Format

    www-civ.eng.cam.ac.uk/cjb/concplas/10ibell.pdf
    25 Jul 2007: Figure 24 demonstrates its implementation. This system was shown to be practical and even more effective than the equivalent near-surface mounted (NSM) strengthening scheme due to there being no possibility ... Drilled holes Injected paste. Strengthening
  7. frprcs9final00067

    www-civ.eng.cam.ac.uk/cjb/papers/cp85.pdf
    26 Mar 2010: The stress steps were chosen to give failure after about 24 hours so that a daily cycle of tests could be performed.
  8. report1.dvi

    www-civ.eng.cam.ac.uk/dsl/publications/TR170.pdf
    21 Mar 2001: TB =. 1. 24. 24b1 0 b2 0 b3 00 c1 0 c2 0 c3c1 b1 c2 b2 c3 b3. ... Figure 3.2: Equilibrium surface. 24. 0.2 0.1 0 0.1 0.2. 0.1.
  9. 28 Feb 2003: strains’ of Y 0:25% (suggested by the Eurocreteproject. 24), and Y 0:45% (proposed in ‘The Sheffield. ... 24. CLARKE J. L. and O’REGAN D. P. Design of concrete structures.
  10. report_final.dvi

    www-civ.eng.cam.ac.uk/dsl/publications/TR192.pdf
    21 Mar 2001: 2.24). wherefromYoung(1989p.68). I x. =. R3t. 1. 3t 2R+. t2 R2. ... The transformation of the nodal coordinates is2. 4XYZ. 35 =. 24 cos sin 0sin cos 0.
  11. A Numerical Approach to the Kinematic Analysis of Deployable ...

    www-civ.eng.cam.ac.uk/dsl/publications/Numerical_approach.pdf
    20 Mar 2006: Hence substituting Equation 23. into Equation 24, one obtains. (T1T ′̄AT3TB̄T1TC̄ T3TD̄) θA. ... 23. 7 Definition of hinge angle θA. 24. 8 Deployable square frame proposed by Hedgepeth.

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.