Search
Search Funnelback University
41 -
50 of
231
search results for KaKaoTalk:ZA31 24 24 |u:www-civ.eng.cam.ac.uk
where 0
match all words and 231
match some words.
Results that match 1 of 2 words
-
LATERAL SPREADING OF SLOPES
www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR318.pdf4 Mar 2002: 4.5 Test SKH-17 The results of test SKH-17 are plotted in Figures 21-24. ... PPT2259. PPT6669. PPT6794. PPT6260. Max= 7.18. Min= 4.92. Max= 64.1. Min= 24.2. -
Fracture Mechanics of Plate DebondingP. M. M. Achintha1 and ...
www-civ.eng.cam.ac.uk/cjb/papers/p59.pdf22 Mar 2010: Fracture Mechanics of Plate DebondingP. M. M. Achintha1 and C. J. Burgoyne2. Abstract: This paper presents a fracture mechanics model to determine the load at which FRP plates will debond from reinforcedconcrete beams. This will obviate the need for -
E:CURRENT_WORKDERA PROJECTSMALL SATELLITE MECHANISMSREPORT.DVI
www-civ.eng.cam.ac.uk/dsl/publications/TR190.pdf17 Nov 2000: 20. 3.4 Mass Estimates. 22. 3.5 Discussion. 22. 4 Deployable Reflector 24. ... 24. (Miura and Miyazaki 1990), in which the triangulated net was supported by six telescopic. -
NEW CONCEPTS FOR SPACECRAFT ANTENNAS AND RADAR STRUCTURESBASED ON ...
www-civ.eng.cam.ac.uk/dsl/publications/New%20concepts.pdf17 Feb 2006: A T300/LTM45 plain weave CFRP, 3-ply laminate (0/45/0) with uniform thickness wasadopted.Rmin was set at 24 mm, which provides a margin of 2.3 on material -
D:\Papers\Foldable composite structures-IASS\Paper.dvi
www-civ.eng.cam.ac.uk/dsl/publications/FoldableCompStruc.pdf15 Aug 2003: Yee, J.C.H. and Pellegrino, S. (2003b) Folding of composite structures. Conference onDeformation and Fracture of Composites (FRC-7), Sheffield University, 22-24 April2003. -
Osman, A. S., Mair, R. J. & Bolton, M. ...
www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/176.pdf16 Nov 2006: 2.89 3.13 1.76 1.99 0.62 0.841 4.46 4.76 3.35 3.64 2.24 2.51 1.11 1.37. ... 2.72 22.450.5 9.62 9.72 6.39 6.53 3.15 3.34 0.11 0.140.75 12.10 12.24 8.88 9.06 -
SEISMIC MODELLING OF EMBANKMENTSON SAmRATED SOIL DEPOSITS.…
www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR300.pdf17 Aug 2001: 1 5 01. ACCs 7 max=24.59. 1258 $j min=-27.760 0.05 0.1 0.15 02. -
Modelling of deformations inDynamic Soil-Structure Interaction…
www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR277.pdf17 Aug 2001: 2 2. % G 0 ACC 1 0. - 2 24 6. -
Database of closed-ended piles in sand: a comparison of qc and qb
www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR327.pdf15 May 2003: Site 11: Seattle (Gurtowski et al. 1984) [S] Two compression tests on octagonal concrete precast piles of nominal 24 inch (608 mm) diameter are reported (Table 11). ... 1984) table 1 qb/qc (D/40 failure) 0.29 0.24 Chow (1996) interpretation qc (av. /- -
TOWER CONSTRUCTIONON LAYERED GROUND Data of beam centrifuge tests ...
www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR261.pdf29 Aug 2001: 7. Tower Construction. (52kPa) for about 24 hours. The stre;s on the clay was then doubled every day until a uniform. ... Each of these 3 data sets are divided as. follows: From the start of each record YO shortly after 02:24 are the data caused by the
Search history
Recently clicked results
Recently clicked results
Your click history is empty.
Recent searches
- p53 |u:www.mrc-tox.cam.ac.uk (2) · moments ago
Recent searches
Your search history is empty.