Search

Search Funnelback University

Search powered by Funnelback
11 - 13 of 13 search results for KaKaoTalk:ZA31 24 24 |u:www.hep.phy.cam.ac.uk where 0 match all words and 13 match some words.
  1. Results that match 2 of 3 words

  2. Two-axis unicycle simulation and control

    https://www.hep.phy.cam.ac.uk/~lester/teaching/PartIIIProjects/2011-NickStenning-REPORT-final-version.pdf
    1 May 2014: end for. 24. 1 Introduction. 2 Theory & control approach. 2.1 Unicycle dynamics.
  3. TRIGGER DESIGN FOR THE EAST OF ENGL AND SPARK ...

    https://www.hep.phy.cam.ac.uk/~lester/teaching/PartIIIProjects/2008-JonnyLee-SparkChamberTrigger-REPORT-final-version.pdf
    1 May 2014: Approximately, the accidentals rate is proportional to the product of the dark current and pulse width so the accidentals ratio for H6780 to H7826 to H8443 to XP3240 is 1 : 24 :
  4. Construction and Evaluation of a Fast Switching Trigger Circuit for a …

    https://www.hep.phy.cam.ac.uk/~lester/teaching/PartIIIProjects/2009-PhilDeGrouchy-SparkChamberTrigger-REPORT-final-version.pdf
    1 May 2014: 1. Construction and Evaluation of a Fast Switching Trigger Circuit for a Cosmic Ray Detection Spark Chamber Candidate Number: 8261R Project Supervisor: Dr. Lester 1. ABSTRACT A pulsing circuit is designed and constructed capable of raising up to

Refine your results

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Your search history is empty.