Search
Search Funnelback University
31 -
40 of
231
search results for KaKaoTalk:ZA31 24 24 |u:www-civ.eng.cam.ac.uk
where 0
match all words and 231
match some words.
Results that match 1 of 2 words
-
Burgoynefinal2
www-civ.eng.cam.ac.uk/cjb/papers/cp91.pdf8 Apr 2011: Careful choice of temperature step and step duration allow the test to be completed in about 24 hours. ... van Leeuwen J. and Siemes A.J.M. (1979). Miner's rule with respect to plain concrete, Heron, 24(1),1–34 Yamaguchi, T., Kato Y., Nishimura T. -
Durability and Mechanical Properties of Deep-Mixed Clays
www-civ.eng.cam.ac.uk/geotech_new/publications/abstracts/abst-osman_abir.html10 Jul 2007: Furthermore, allowing the bentonite to hydrate for 24 hours or using a high shear mixer to mix the bentonite yielded much higher strengths and lower permeabilities at all ages for the -
ACM-186
www-civ.eng.cam.ac.uk/cjb/papers/cp67.pdf20 Jul 2004: The motorway has 3 lanes in each direction, of which 2 were assumed closed between 0:00-6:00 and 19:00-24:00, and one from 6:00-16:00, ... 5. 0 5 10 15 20 24. -4.5. -4. -3.5. -3. -
E:CURRENT_WORKCRTS TECHNOLOGYREPORT.DVI
www-civ.eng.cam.ac.uk/dsl/publications/TR195.pdf5 Apr 2001: Configuration 12 13.4. 24 3.6. Circular 6 45.9. Configuration 12 12.5. ... apertures of 1, 3, 5, and 10 m, with 6, 12, and 24 ribs. -
FRPRCS-8 Full Paper Format
www-civ.eng.cam.ac.uk/cjb/concplas/03baskaran.pdf11 Jul 2007: Wood showed the resulting momecould be given as [15]. 6. 22 pxpLxM = 24. , ... then the support moment 12/2pLsm =. and the corresponding span moments are 24. -
frprcs9final00067
www-civ.eng.cam.ac.uk/cjb/papers/cp85.pdf26 Mar 2010: The stress steps were chosen to give failure after about 24 hours so that a daily cycle of tests could be performed. -
report1.dvi
www-civ.eng.cam.ac.uk/dsl/publications/TR170.pdf21 Mar 2001: TB =. 1. 24. 24b1 0 b2 0 b3 00 c1 0 c2 0 c3c1 b1 c2 b2 c3 b3. ... Figure 3.2: Equilibrium surface. 24. 0.2 0.1 0 0.1 0.2. 0.1. -
report_final.dvi
www-civ.eng.cam.ac.uk/dsl/publications/TR192.pdf21 Mar 2001: 2.24). wherefromYoung(1989p.68). I x. =. R3t. 1. 3t 2R+. t2 R2. ... The transformation of the nodal coordinates is2. 4XYZ. 35 =. 24 cos sin 0sin cos 0. -
LATERAL SPREADING OF SLOPES
www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR317.pdf28 Feb 2002: Figure 23: Pore pressures measured in test SKH-11 35 Figure 24: Accelerations measured in test SKH-12 37. ... of approximately 20% magnitude. No significant ground displacement was measured. The results of test SKH-12 are plotted in Figure 24. -
A Numerical Approach to the Kinematic Analysis of Deployable ...
www-civ.eng.cam.ac.uk/dsl/publications/Numerical_approach.pdf20 Mar 2006: Hence substituting Equation 23. into Equation 24, one obtains. (T1T ′̄AT3TB̄T1TC̄ T3TD̄) θA. ... 23. 7 Definition of hinge angle θA. 24. 8 Deployable square frame proposed by Hedgepeth.
Search history
Recently clicked results
Recently clicked results
Your click history is empty.
Recent searches
Recent searches
Your search history is empty.