Search

Search Funnelback University

Search powered by Funnelback
51 - 60 of 135 search results for KaKaoTalk:PC53 24 / |u:www.arct.cam.ac.uk where 0 match all words and 135 match some words.
  1. Results that match 1 of 2 words

  2. The Roeblings and the Stayed Suspension Bridge: Its Development and…

    https://www.arct.cam.ac.uk/system/files/documents/vol-1-441-460-buonopane.pdf
    War Department (RPI, box 11, folders 23-24). For the East Rockport Bridge (1868), a 550 ft span footbridge, Roebling used a total live load of 150 persons of 150 lbs ... 7 14 1-1/8 2.11 19.5 21.9 10.4. 8 13 1-1/4 2.64 22.0 24.1 9.1.
  3. “De Hedificiis Communibus Murandis …”

    https://www.arct.cam.ac.uk/system/files/documents/vol-3-3117-3132-tragbar.pdf
    On 24 May 904 Berengar I allows bishop Adalbert of Bergamo to rebuild towns’ fortification together with the townsfolk (Böhmer 1833, no. ... 180; Vichi Imberciadori 1980, p. 24 note 36), the one of the statutes of 1415, IV, 9, has almost the same
  4. The Making of the Modern Metropolis:Evidence from London Stephan ...

    https://www.arct.cam.ac.uk/system/files/documents/session4-stephen-redding.pdf
    24 / 43. Treatment Heterogeneity. -3-2. -10. 12. Cha. nge. in P.
  5. Materials Used in the Construction, Conservation, and Restoration of…

    https://www.arct.cam.ac.uk/system/files/documents/vol-3-2573-2586-ranaweera.pdf
    2579. Figure 7. Kirivehera (height = 24.4 m, base diameter = 25.6 m) showing thick original plaster.
  6. A Heritage of Shops: an Investigation into the Evolution of Historic…

    https://www.arct.cam.ac.uk/system/files/documents/vol-2-1901-1920-lennie.pdf
    By the 1930’s, shopfitters submitted 24% whereas the number of applications by Perth architects had dropped to only 49% from a peak of 92% in the first 10 years of ... 1930-1939. 33 (49%) 4 (6%) 8 (12%) 16 (24%) 5 (7%) 1 (2%) 67.
  7. Urban Dynamics

    https://www.arct.cam.ac.uk/system/files/documents/session8-geoffrey-hewings.pdf
    1,370. 4,479. 105. 141. 27. 698. 24. 4. 128. 159. 27. ... 7,578. LakeIL. 1,949. 373. 24. 9,046. 146. 215. 3,202. 50. 29.
  8. Construction History Vol. l l . 1996 Abstracts of ...

    https://www.arct.cam.ac.uk/system/files/documents/chs-vol.11-pp.81-to-88.pdf
    24-35. The sources of printed information used by building designers are largely ephemeral and the survival of this material has been rather haphazard.
  9. Construction History and Experimentation

    https://www.arct.cam.ac.uk/system/files/documents/vol-3-2777-2792-sakarovitch.pdf
    For the 24 places available per course, we get 80 to 100 applications.
  10. Kiev Suspension Bridge 1846 – 1853

    https://www.arct.cam.ac.uk/system/files/documents/vol-3-3211-3232-vignoles.pdf
    Budapest Tierney Clark 1839 – 1849 666 ft 1262 ft. On 24 December, Vignoles went to see Mr Cheffins, who provided a draughting and printing service, to prepare drawings; and he commissioned ... absence. PROPOSAL SUBMISSION Journey to Warsaw Armed with
  11. Genesis of a General Contractor: a Georgian Vernacular Builder…

    https://www.arct.cam.ac.uk/system/files/documents/vol-3-2547-2558-powell.pdf
    Taking one example during a busy time in the week beginning 24 June 1854, three employees lodged at a total cost to the firm of 3/9d. ... In the week beginning 15 April 1854 24 employees worked 133.5 man-days for total wages of £15-9-9d.

Refine your results

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.