Search

Search Funnelback University

Search powered by Funnelback
1 - 10 of 473 search results for katalk:za33 24 |u:www-g.eng.cam.ac.uk where 0 match all words and 473 match some words.
  1. Results that match 1 of 2 words

  2. Graphene, human brain project' get 2 bn euro funds - FRANCE 24

    www-g.eng.cam.ac.uk/nms/highlights-press/flagship4.pdf
    28 Jan 2013: funds#comments)0. Graphene, human brain project' get 2 bn euro funds - FRANCE 24 http://www.france24.com/en/20130128-graphene-human-brain-project.
  3. Enginuity

    www-g.eng.cam.ac.uk/enginuity/issue7/index.html
    We were delighted to receive 23 out of 24 points, adding to Cambridge University's impressive overall record of TQA results.
  4. Enginuity

    www-g.eng.cam.ac.uk/125/1975-2000/enginuity/issue7/index.html
    We were delighted to receive 23 out of 24 points, adding to Cambridge University's impressive overall record of TQA results.
  5. SSJC Meetings

    www-g.eng.cam.ac.uk/ssjc/meetings.html
    Minutes of the recent meetings:. Minutes of previous years' meetings:.
  6. www-g.eng.cam.ac.uk/reactingflows/index.xml

    www-g.eng.cam.ac.uk/reactingflows/index.xml
    2 Nov 2023: uk/reactingflows/posts/hello_world/ aaaaaa vvvv aaa Synthesis of battery materials http://www-g.eng.cam.ac.uk/reactingflows/projects/flame_synthesis/ Mon, 24 Jul 2023 00:00:00 0000
  7. Engineering for the Life Sciences

    www-g.eng.cam.ac.uk/lifesciences/links.html
    Abstracts due 12 Oct. 2007. MRS Spring Meeting 2008, March 24-28.
  8. COSMOS - EPSRC basic technology grant

    www-g.eng.cam.ac.uk/cosmos/news.html
    For more information, see Outreach page. (Posted 24/07/08). - Deadline for registration for COSMOS showcase event extended to 30th May.
  9. John Baker

    www-g.eng.cam.ac.uk/125/1925-1950/baker.html
    In 1943, when John Fleetwood Baker was elected Head of Department, the Engineering Department was staffed by 24 lecturers and there was one other chair.
  10. NMS Group

    www-g.eng.cam.ac.uk/nms/patents.html
    24. Laser device. D. Popa, G. Cerullo, T. Scopigno, D. Polli, A.C.
  11. The Jubilee Line Extension

    www-g.eng.cam.ac.uk/125/now/jubilee3.html
    Grouting episodes typically of 24-hour duration were continued over the whole period during which excavations were occurring - about 28 months.

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.