Search

Search Funnelback University

Search powered by Funnelback
21 - 40 of 231 search results for TALK:Vb20 24 / |u:www-civ.eng.cam.ac.uk where 0 match all words and 231 match some words.
  1. Results that match 1 of 2 words

  2. Chris Calladine

    www-civ.eng.cam.ac.uk/struct/crc/publications.html
    21 Aug 2008: J. Mech. Sci., 24, 219-230 (1982). 57. C.R. Calladine, 'Modal stiffnesses of a pre-tensioned cable net', Int. ... 110. C.R. Calladine, "Some paradoxical experiments on beams". International Journal of Mechanical Engineering Education, 24, 37-48 (1996).
  3.  

    www-civ.eng.cam.ac.uk/dsl/publications.html
    19 Feb 2008: AIAA Balloon Systems Conference, 21-24 May, 2007, Williamsburg, VA, AIAA-2007-2632. (paper.pdf). ... AIAA Balloon Systems Conference, 21-24 May, 2007, Williamsburg, VA, AIAA-2007-2606. (paper.pdf).
  4. EMPIRICAL PILE DESIGN BASED ON CONE PENETROMETER DATA: AN EXPLANATION …

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/103_DFP_2001_125_132.pdf
    6 Oct 2001: Bolton et al [24] measured the influence of chamber size on axial load response and concluded that no significant boundary effect would occur if a distance of 11 pile diameters was ... 2, pp. 787-806. [24] BOLTON, MD, GUI, MW, GARNIER, J, CORTE, JF, BAGGE
  5. Chris Burgoyne Publications Page

    www-civ.eng.cam.ac.uk/cjb/cjbpublications.html
    4 Oct 2011: theory. Journ. Solids & Structures, 32/24, 3573-3588, 1995. Lees J.M., Gruffydd-Jones B. ... of Bone and Mineral Research, 24/11, 1808-1818, 2009. doi: 10.1359/JBMR.090504.
  6. In-Situ Photocatalytic Remediation of Organic Contaminants in…

    www-civ.eng.cam.ac.uk/geotech_new/publications/abstracts/abst-Lim.html
    22 Jun 2010: The same set of catalyst and 15 W Philips Cleo UVA fluorescent lamp was operated for a total of about 582 h (24 d) out of the cumulative 1039 h (43
  7. E:CURRENT_WORKCRTS DEMONSTRATORREPORT.DVI

    www-civ.eng.cam.ac.uk/dsl/publications/CRTS2001.pdf
    21 Mar 2001: 50 mm. 85 mm. Figure 3.4: Cylindrical mould. 22 23 24 25 26 27 28 29 30 31 3216. ... 17. 18. 19. 20. 21. 22. 23. 24. Rm [mm]. Rr[mm] Rr = 0.4957Rm 6.7181.
  8. Dynamic Response of theEquivalent Shear Beam (ESB) Container S.P.G.…

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR270.pdf
    22 Aug 2001: o z. -a. b-1. ACC344. [m-cl. Max=25.5. Mill=-24.9. Mill=-13.0. Mox=27.9. Mln=-28.0. ... m s e c ]. Mox=25.9. Mln=-24.4. MmG13.3. Min=-12.5. Max=5.0.
  9. frprcs9final00067

    www-civ.eng.cam.ac.uk/cjb/papers/cp85.pdf
    26 Mar 2010: The stress steps were chosen to give failure after about 24 hours so that a daily cycle of tests could be performed.
  10. Durability and Mechanical Properties of Deep-Mixed Clays

    www-civ.eng.cam.ac.uk/geotech_new/publications/abstracts/abst-osman_abir.html
    10 Jul 2007: Furthermore, allowing the bentonite to hydrate for 24 hours or using a high shear mixer to mix the bentonite yielded much higher strengths and lower permeabilities at all ages for the
  11. FRPRCS-8 Full Paper Format

    www-civ.eng.cam.ac.uk/cjb/concplas/19prakhya.pdf
    12 Jul 2007: 06 71.20 0.24 1.09 15.10 2.21 DG2 0.90 0.25 2.10 2.16 9.67 0.68 0.03 0.00 DG3 1.47 ... 29 1.86 0.88 0.94 0.90 DG11 1.24 0.06 1.87 2.29 0.84 1.0 3.53 0.29 DG12 1.24 0.90
  12. TR324

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR324.pdf
    7 Oct 2002: CUED/D-SOILS/TR324 (October 2002) Page-24. Figure 18: Plastic deformation measurements of pile 8 after test SB-04.
  13. paper.dvi

    www-civ.eng.cam.ac.uk/dsl/publications/balloons.pdf
    8 Feb 2000: 24. L2. h2B. 2(15). and. v =h 2. 24. L2. h2 B. ... u v = 2. h 2. 24. L. h. 2(19). u2 v2 =. h 2. 24. 2 L. h. 4B2 2. 4(20). Substituting back into Equation 18, ignoring higherorder terms, and
  14. Burgoynefinal2

    www-civ.eng.cam.ac.uk/cjb/papers/cp91.pdf
    8 Apr 2011: Careful choice of temperature step and step duration allow the test to be completed in about 24 hours. ... van Leeuwen J. and Siemes A.J.M. (1979). Miner's rule with respect to plain concrete, Heron, 24(1),1–34 Yamaguchi, T., Kato Y., Nishimura T.
  15. E:CURRENT_WORKCRTS TECHNOLOGYREPORT.DVI

    www-civ.eng.cam.ac.uk/dsl/publications/TR195.pdf
    5 Apr 2001: Configuration 12 13.4. 24 3.6. Circular 6 45.9. Configuration 12 12.5. ... apertures of 1, 3, 5, and 10 m, with 6, 12, and 24 ribs.
  16. FRPRCS-8 Full Paper Format

    www-civ.eng.cam.ac.uk/cjb/concplas/10ibell.pdf
    25 Jul 2007: Figure 24 demonstrates its implementation. This system was shown to be practical and even more effective than the equivalent near-surface mounted (NSM) strengthening scheme due to there being no possibility ... Drilled holes Injected paste. Strengthening
  17. t2012-023 631..631

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/212_corrigendum.pdf
    28 Nov 2013: 24], [26], and [28] should read:. 24 q6cu. 12. 1:35w. gM2D.
  18. 021004_GIANNOPOULOS

    www-civ.eng.cam.ac.uk/cjb/papers/cp90.pdf
    26 Mar 2010: 0 500 1000 1500 2000 250020. 22. 24. 26. 28. 30.
  19. reporthomo

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR330.pdf
    27 Oct 2004: Figure 24: Stress cell measurements in test BG-03 for 50Hz frequency. ... 20. 21. 22. 23. 24. 25. 26. 2. 4. 3. 5.
  20. SE1 p1 Cover

    www-civ.eng.cam.ac.uk/cjb/papers/p48.pdf
    3 Feb 2004: 24|The Structural Engineer – 6 January 2004. paper: burgoyne. Fig 10 shows the load factor that should be applied to theexternal load so that the bottom steel is sufficient to carry
  21. 20 Mar 2000: The Storchen Bridge in Wintherthur,Switzerland, with a total length of 124 m has two of its 24 cables madefrom carbon fibres [18]. ... 23] HAY, J. Response of Bridges to Wind.HMSO, London, 1992. [24] SHEARD P.

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.