Search

Search Funnelback University

Search powered by Funnelback
1 - 20 of 231 search results for TALK:Vb20 24 / |u:www-civ.eng.cam.ac.uk where 0 match all words and 231 match some words.
  1. Results that match 1 of 2 words

  2. SE6_P1CO.VER

    www-civ.eng.cam.ac.uk/cjb/papers/p43.pdf
    15 Nov 2001: v = wsinφ [ z4 - Lz3 L3z ]. (1)EIy 24 12 24where.
  3. Concrete Bridge Assessment Using Plastic Collapse Analysis…

    www-civ.eng.cam.ac.uk/brg/papers/brgsrv98/plaintbl.html
    12 Aug 1998: Hudson tests Kite tests Test No. H1 H2 H3 H4 K1 K2 K3 K4 Ptest (kN) 29.2 28.3 27.9 19.0 23.4 23.5 24.1 ... 7 PCOBRAS (kN) 24.5 25.3 23.0 17.2 22.5 22.3 20.5 17.7 Ptest/PCOBRAS 1.19 1.12 1.21 1.10 1.04
  4. TechRep_1.dvi

    www-civ.eng.cam.ac.uk/dsl/publications/CRTS_vibration.pdf
    26 Mar 2001: ModeFrequency (Hz). 6 ribs 12 ribs 24 ribs. 1 16.46 17.78 17.40. ... ModeFrequency (Hz). 6 ribs 12 ribs 24 ribs. 1 3.14 2.97 2.85.
  5. The Ageing and Creep of Dense Granular Materials

    www-civ.eng.cam.ac.uk/geotech_new/publications/abstracts/abst-deeks.html
    17 Oct 2008: In the first test series 24 pile installations were conducted that simulated axial-jacking.
  6. Chris Morley

    www-civ.eng.cam.ac.uk/struct/ctm/publications.html
    30 Nov 2007: Magazine of Concrete Research. Special Publication on Recent Developments in Yield Line Theory, 13-24.
  7. 11 Jan 2000: J. Mech. Sci., 24, 219-230 (1982). 57. C.R. Calladine, 'Modal stiffnesses of a pre-tensioned cable net', Int. ... 110. C.R. Calladine, "Some paradoxical experiments on beams". International Journal of Mechanical Engineering Education, 24, 37-48 (1996).
  8. CUED Bridge Research - Publications

    www-civ.eng.cam.ac.uk/brg/papers/
    29 Sep 2004: 1997. Middleton, C.R. Concrete bridge assessment: an alternative approach. The Structural Engineer, Vol.75 No.23&24, 9th December 1997, pp.403-409.
  9. 27 Mar 2010: The method enables creep data for simulated times of several hundred years to be obtained from 24 hour tests.
  10. CUED home page - W Huang: actuator.html

    www-civ.eng.cam.ac.uk/dsl/sma/actuator.html
    21 Jul 1998: 24 mm, i.d. 9 mm). In order to insulate both electrically and thermally the Nitinol wire from the steel disk, a series of Macor cylinders with 1.1 mm diameter
  11. A New Technique for Simulation of Collapseof a Tunnel ...

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR286.pdf
    7 May 2002: The solenoid valves could be operated by a 24 V d.c. ... Page 17. Technical Report No. CUJZD/D&ils/TR286 Sharma & Bolton. 3 028 - EJ Without any surface water26 -24 -. With surface water. 2 1 8E 16z 1 4. 121086420.
  12. Matthew DeJong - Publications

    www-civ.eng.cam.ac.uk/struct/mjd/publications.html
    10 Jan 2017: DeJong MJ, De Lorenzis L, Adams S, Ochsendorf JA (2008). Rocking stability of masonry arches in seismic regions, Earthquake Spectra, 24(4), 847-865.
  13. Department of Engineering - Bridge Research Group - Publications

    www-civ.eng.cam.ac.uk/brg/publications.html
    22 Dec 2011: In Proceedings of the Annual International fib Symposium Concrete : 21st Century Superhero, Building a sustainable future, held in London, 22-24 June 2009. ... In Foundations: proceedings of the second British Geotechnical Association international
  14. Environmental effects on cover cracking due to corrosion

    www-civ.eng.cam.ac.uk/cjb/papers/p68.pdf
    4 Aug 2010: 24], which relates concrete resistivity to humidity. Thismodification introduces an increase of concrete resistivity nearsaturation. ... are relevant factorsaffecting the ion movement and therefore the corrosion propagation[24,29–31].
  15. D:CURRENT_WORKMEMBRANE VIBRATION IN AIRSDM PAPERSDM_PAPER.DVI

    www-civ.eng.cam.ac.uk/dsl/publications/AIAA2002-1368.pdf
    18 Feb 2002: ma =ρ. k2s ω2airρ/B(24). If there is air on both sides of the membrane, the sameanalysis can be repeated to obtain an equation like(24), but with a factor ... 57.0 -4.24 84.4 70.2 67.1 -4.45 90.8 86.6 79.9 -7.7.
  16. Cam Middleton: Publications

    www-civ.eng.cam.ac.uk/struct/crm/publications.html
    27 May 2011: In Proceedings of the Annual International fib Symposium Concrete : 21st Century Superhero, Building a sustainable future, held in London, 22-24 June 2009. ... 1997. Middleton, C.R. Concrete bridge assessment: an alternative approach. The Structural
  17. Durability and Mechanical Properties of Deep-Mixed Clays

    www-civ.eng.cam.ac.uk/geotech_new/publications/abstracts/abst-osman_abir.html
    10 Jul 2007: Furthermore, allowing the bentonite to hydrate for 24 hours or using a high shear mixer to mix the bentonite yielded much higher strengths and lower permeabilities at all ages for the
  18. 74913-2 253..262

    www-civ.eng.cam.ac.uk/cjb/papers/p45.pdf
    9 Nov 2001: externally, by putting the. concrete in the compression. zone into triaxial compression, or by fibre-reinforcing it.23,24. ... University Internal Report 97/98, 1998. 24. TANIGUCHIANIGUCHI H., MUTSUYOSHIUTSUYOSHI H., KITAITA T.
  19. E:CURRENT_WORKTENSEGRITY_FORM-FINDINGPAPER.DVI

    www-civ.eng.cam.ac.uk/dsl/publications/tensegrity.pdf
    2 Apr 2001: E(p) =12pT. . p, (24). where the elements of are given by. ... Proceedings of Cold Spring Harbor Symposium on Quantitative Biology, 1962, 27, 1-24.
  20. In-Situ Photocatalytic Remediation of Organic Contaminants in…

    www-civ.eng.cam.ac.uk/geotech_new/publications/abstracts/abst-Lim.html
    22 Jun 2010: The same set of catalyst and 15 W Philips Cleo UVA fluorescent lamp was operated for a total of about 582 h (24 d) out of the cumulative 1039 h (43
  21. Concrete Bridge Assessment Using Plastic Collapse Analysis

    www-civ.eng.cam.ac.uk/brg/papers/brgsrv98/
    29 Feb 2000: Assistant Director of Research, University of Cambridge, U.K. First presented at the Bridge Surveyor Conference, 24. ... A2. P. test. (kN). 29.2. 28.3. 27.9. 19.0. 23.4. 23.5. 24.1.

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.