Search
Search Funnelback University
- Refined by:
- Date: 2005
1 -
10 of
19
search results for TALK:PC53 20 |u:www-civ.eng.cam.ac.uk
where 0
match all words and 19
match some words.
Results that match 1 of 2 words
-
Cambridge University Engineering Dept. - Structures Group
www-civ.eng.cam.ac.uk/abstract/Ekstromabs.html10 Mar 2005: An in-depth review of 20 currently available thermoplastic composite joining techniques is presented. -
Remediation of DNAPL using Surfactant flushing-Mass flux approach.
www-civ.eng.cam.ac.uk/geotech_new/publications/abstracts/abst-kulasooriya.htm23 Nov 2005: In general, 20-40% overprediction in mass flux was obtained when the uniform flow model was used instead of the non-uniform flow model. -
Observation of flexural cracks in loaded concrete beams using ...
www-civ.eng.cam.ac.uk/cjb/papers/p52.pdf24 May 2005: The shear link spacing was 20 mm. throughout, with inclined stirrups over the loading re-. ... a 20 mm overlap. The concrete in the beam was cured under water for. -
Micromechanical Models for Bending Behavior of Woven Composites
www-civ.eng.cam.ac.uk/dsl/publications/AIAA-2005-2264.pdf17 May 2005: 0. 100. 200. 300. 400. 500. 600. 0.00 0.20 0.40 0.60 0.80 1.00 1.20. ... 15. 20. 25. 0.00 0.03 0.06 0.09 0.12. Curvature (1/mm). Mo. -
CUED TR 341 _2_
www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR341.pdf30 Sep 2005: z. gf. Ldp. gf dykzfdykzfdykzfzy τττττττττ )(),()(),()(),()( 20. 1. 0. 48476 Eq. ... A 20 m long pile of 0.5 m diameter exists 6m away from the tunnel centreline. -
Qing XuCapita Symonds,East Grinstead, UK Chris BurgoyneDepartment of…
www-civ.eng.cam.ac.uk/cjb/papers/p54.pdf20 Dec 2005: The monolithic (20-day). value (point A in Fig. 8) alters immediately to B when the. ... 6. The first stage,. which becomes self-supporting at 20 days, is statically. -
AIAA 2004-1529Multi-Configuration Space FramesT. Schioler and S.…
www-civ.eng.cam.ac.uk/dsl/Schioler/publications/SDM2004.pdf30 Jan 2005: Figure 20 shows the measured force-displacement characteristics as well as the theoreticalresponse derived by assuming elastic axial shorteningand Euler buckling. ... 10. 15. Force. (N). Displacement (mm). Fig. 20 Comparison of theoretical and -
231-2.pmd
www-civ.eng.cam.ac.uk/cjb/papers/cp70.pdf10 Dec 2005: 20 Burgoynemonument to the murder by a returning crusader of his wife’s lover. ... 20. Anon, An Exhibition of Prestressed Concrete, Concrete Constr. Engng, 44, 129,. -
TR337
www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR337.pdf6 Oct 2005: Min= -0.802. 20 40 60 80 100 120 140-200. 0. 200. ... mm. Time(s). 20 40 60 80 100 120 140-50. 0. 50. -
Design & Manufacture of Stiffened Spring-Back Reflector…
www-civ.eng.cam.ac.uk/dsl/publications/AIAA-2005-2048.pdf17 May 2005: Hence the curvedstiffener is a circular arc of r = 20 mm subtending anangle of 69. ... The first 20 eigenmodes wereextracted and the maximum frequency of interest wasset to 40 Hz.
Search history
Recently clicked results
Recently clicked results
Your click history is empty.
Recent searches
Recent searches
Your search history is empty.