Search

Search Funnelback University

Search powered by Funnelback
1 - 12 of 12 search results for KaKaoTalk:vb20 200 |u:www-civ.eng.cam.ac.uk where 0 match all words and 12 match some words.
  1. Results that match 1 of 2 words

  2. Discussion: Laboratory measurement of strength mobilisationin kaolin: …

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/216%20discussion.pdf
    28 Nov 2013: Thesetrends have been supported by larger datasets includingover 200 vane shear test (VST) data and over 200 la-boratory strength data (Mayne, 2012).
  3. Effect of previous cyclic axial loadson pile groups Zheming ...

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/217.pdf
    28 Nov 2013: 200. 0. 1000. 400. 600. 800. 200. _200. 0. 0Pile cap lateral displacement uG: m. ... 50th cycle. 200. _200. 0. 1000. 400. 600. 800. 200. _200.
  4. Water supply to a geotechnicalcentrifuge Paul Shepley MEngLecturer,…

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/225.pdf
    28 Nov 2013: pressure of 200 kPa, directly to the centrifuge slip rings. Maximum pressures of 1?3 MPa were experienced at the package,. ... 00–600 –400 –200. Calculated pressure at slip rings, Ps: kPa400200 600.
  5. Laboratory measurement of strength mobilisation in kaolin: link…

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/216.pdf
    28 Nov 2013: 159 36?4 1?14 0?03265500(20) 3?350 0?602 0?997 200 32?8 1?20 0?04389500(1)_Xu 3?236 0?311 0?987 45
  6. Kwok, C. Y. & Bolton, M. D. (2013). Géotechnique ...

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/228.pdf
    29 Nov 2013: 10. 15. 20. 25. 30. 35. 40. 0 100 200 300 400 500. ... 1. 5. 20. 40. 70. 85. 94. 96. 98. 99. 150 200 250 300 350 400 450 500.
  7. A new apparatus for modellingexcavations Sze Yue LamResearch…

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/215.pdf
    28 Nov 2013: 300. 200. 100. 00. (a). (b). (c). 10 000 20 000 30 000 40 000. ... props. The maximum bending moment induced by the. undrained excavation amounted to about 200 kNm/m.
  8. Haigh, S. K. et al. (2013). Géotechnique 63, No. ...

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/222.pdf
    28 Nov 2013: 020406080. 100. 0 100 200 300 400 500 600Per. cent. age.
  9. 54 Oztoprak, S. & Bolton, M. D. (2013). Géotechnique ...

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/221.pdf
    28 Nov 2013: 200–. 400. 400–. 600. 60. 0. Test. num. ber. Confinement pressure: kPa(a). ... 200. Fig. 9. Normalised shear modulus degradation curves of Toyourasand shifting with mean effective stress.
  10. 500 Kuo, M. & Bolton, M. (2013). Géotechnique 63, ...

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/223.pdf
    28 Nov 2013: 200. 175. 150. 125. 100. 075. 050. 025. 0. 0 20 40 60 80. ... However, faecalpellets were found to have an average water content of150% in the tested crust samples, while the silt – clay matrixhad a water content of about 200%.
  11. GTGTENG-2901 1575..1589

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/226.pdf
    28 Nov 2013: 70.98. 80.00. 110. 191.22. 50.99. 10.00. 200. HighlyPlasticSilt. 64.6m. 0.46. 1.36. ... 169. 200.82. 00.97. 50.00. 332. Teachavorasinskun. etal.20. 02Triaxial. Bangk. okClaySite. 10.57.
  12. Cyclic axial behaviour of piles and pile groups in sand

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/219.pdf
    28 Nov 2013: at prototype scale), wall thickness of 0.7 mm (0.035 m atprototype scale), and an embedded depth of 200 mm (10 mat prototype scale).
  13. Proceedings of the Institution of Civil Engineers Geotechnical…

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/218.pdf
    28 Nov 2013: B4. B1. B3. B6. B5. B2. 200 m. Figure 2. Borehole locations. ... 40003000200010000. 40. 120. 160. 200. 0. Dep. th b. elow. top.

Refine your results

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.