Search

Search Funnelback University

Search powered by Funnelback
1 - 50 of 231 search results for :pc53 24 / |u:www-civ.eng.cam.ac.uk where 0 match all words and 231 match some words.
  1. Results that match 1 of 2 words

  2. 27 Mar 2010: The method enables creep data for simulated times of several hundred years to be obtained from 24 hour tests.
  3. E:CURRENT_WORKTENSEGRITY_FORM-FINDINGPAPER.DVI

    www-civ.eng.cam.ac.uk/dsl/publications/tensegrity.pdf
    2 Apr 2001: E(p) =12pT. . p, (24). where the elements of are given by. ... Proceedings of Cold Spring Harbor Symposium on Quantitative Biology, 1962, 27, 1-24.
  4. CUED/D-SoilsiTR290 title paae Numerical modelling of three-leg…

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR290.pdf
    17 Aug 2001: ID-Soils/- SPUDCAN LOAD-DISPLACEMENT AND ROTATION RESPONSES 9. TR290. I. 0.24 0.16 - I I I. ... TR290. 1. 0.24 1 I I 0.16. 0.16 - 0.08. 8.
  5. CUED Bridge Research - Publications

    www-civ.eng.cam.ac.uk/brg/papers/
    29 Sep 2004: 1997. Middleton, C.R. Concrete bridge assessment: an alternative approach. The Structural Engineer, Vol.75 No.23&24, 9th December 1997, pp.403-409.
  6. Matthew DeJong - Publications

    www-civ.eng.cam.ac.uk/struct/mjd/publications.html
    10 Jan 2017: DeJong MJ, De Lorenzis L, Adams S, Ochsendorf JA (2008). Rocking stability of masonry arches in seismic regions, Earthquake Spectra, 24(4), 847-865.
  7. 11 Jan 2000: J. Mech. Sci., 24, 219-230 (1982). 57. C.R. Calladine, 'Modal stiffnesses of a pre-tensioned cable net', Int. ... 110. C.R. Calladine, "Some paradoxical experiments on beams". International Journal of Mechanical Engineering Education, 24, 37-48 (1996).
  8. Environmental effects on cover cracking due to corrosion

    www-civ.eng.cam.ac.uk/cjb/papers/p68.pdf
    4 Aug 2010: 24], which relates concrete resistivity to humidity. Thismodification introduces an increase of concrete resistivity nearsaturation. ... are relevant factorsaffecting the ion movement and therefore the corrosion propagation[24,29–31].
  9. EMPIRICAL PILE DESIGN BASED ON CONE PENETROMETER DATA: AN EXPLANATION …

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/103_DFP_2001_125_132.pdf
    6 Oct 2001: Bolton et al [24] measured the influence of chamber size on axial load response and concluded that no significant boundary effect would occur if a distance of 11 pile diameters was ... 2, pp. 787-806. [24] BOLTON, MD, GUI, MW, GARNIER, J, CORTE, JF, BAGGE
  10. E:CURRENT_WORKCRTS DEMONSTRATORREPORT.DVI

    www-civ.eng.cam.ac.uk/dsl/publications/CRTS2001.pdf
    21 Mar 2001: 50 mm. 85 mm. Figure 3.4: Cylindrical mould. 22 23 24 25 26 27 28 29 30 31 3216. ... 17. 18. 19. 20. 21. 22. 23. 24. Rm [mm]. Rr[mm] Rr = 0.4957Rm 6.7181.
  11. 74913-2 253..262

    www-civ.eng.cam.ac.uk/cjb/papers/p45.pdf
    9 Nov 2001: externally, by putting the. concrete in the compression. zone into triaxial compression, or by fibre-reinforcing it.23,24. ... University Internal Report 97/98, 1998. 24. TANIGUCHIANIGUCHI H., MUTSUYOSHIUTSUYOSHI H., KITAITA T.
  12. Concrete Bridge Assessment Using Plastic Collapse Analysis…

    www-civ.eng.cam.ac.uk/brg/papers/brgsrv98/plaintbl.html
    12 Aug 1998: Hudson tests Kite tests Test No. H1 H2 H3 H4 K1 K2 K3 K4 Ptest (kN) 29.2 28.3 27.9 19.0 23.4 23.5 24.1 ... 7 PCOBRAS (kN) 24.5 25.3 23.0 17.2 22.5 22.3 20.5 17.7 Ptest/PCOBRAS 1.19 1.12 1.21 1.10 1.04
  13. Dynamic Response of theEquivalent Shear Beam (ESB) Container S.P.G.…

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR270.pdf
    22 Aug 2001: o z. -a. b-1. ACC344. [m-cl. Max=25.5. Mill=-24.9. Mill=-13.0. Mox=27.9. Mln=-28.0. ... m s e c ]. Mox=25.9. Mln=-24.4. MmG13.3. Min=-12.5. Max=5.0.
  14. Chris Morley

    www-civ.eng.cam.ac.uk/struct/ctm/publications.html
    30 Nov 2007: Magazine of Concrete Research. Special Publication on Recent Developments in Yield Line Theory, 13-24.
  15. TR324

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR324.pdf
    7 Oct 2002: CUED/D-SOILS/TR324 (October 2002) Page-24. Figure 18: Plastic deformation measurements of pile 8 after test SB-04.
  16. TechRep_1.dvi

    www-civ.eng.cam.ac.uk/dsl/publications/CRTS_vibration.pdf
    26 Mar 2001: ModeFrequency (Hz). 6 ribs 12 ribs 24 ribs. 1 16.46 17.78 17.40. ... ModeFrequency (Hz). 6 ribs 12 ribs 24 ribs. 1 3.14 2.97 2.85.
  17. SE6_P1CO.VER

    www-civ.eng.cam.ac.uk/cjb/papers/p43.pdf
    15 Nov 2001: v = wsinφ [ z4 - Lz3 L3z ]. (1)EIy 24 12 24where.
  18. Department of Engineering - Bridge Research Group - Publications

    www-civ.eng.cam.ac.uk/brg/publications.html
    22 Dec 2011: In Proceedings of the Annual International fib Symposium Concrete : 21st Century Superhero, Building a sustainable future, held in London, 22-24 June 2009. ... In Foundations: proceedings of the second British Geotechnical Association international
  19. Cam Middleton: Publications

    www-civ.eng.cam.ac.uk/struct/crm/publications.html
    27 May 2011: In Proceedings of the Annual International fib Symposium Concrete : 21st Century Superhero, Building a sustainable future, held in London, 22-24 June 2009. ... 1997. Middleton, C.R. Concrete bridge assessment: an alternative approach. The Structural
  20. CUED home page - W Huang: actuator.html

    www-civ.eng.cam.ac.uk/dsl/sma/actuator.html
    21 Jul 1998: 24 mm, i.d. 9 mm). In order to insulate both electrically and thermally the Nitinol wire from the steel disk, a series of Macor cylinders with 1.1 mm diameter
  21. Concrete Bridge Assessment Using Plastic Collapse Analysis

    www-civ.eng.cam.ac.uk/brg/papers/brgsrv98/
    29 Feb 2000: Assistant Director of Research, University of Cambridge, U.K. First presented at the Bridge Surveyor Conference, 24. ... A2. P. test. (kN). 29.2. 28.3. 27.9. 19.0. 23.4. 23.5. 24.1.
  22. Chris Calladine

    www-civ.eng.cam.ac.uk/struct/crc/publications.html
    21 Aug 2008: J. Mech. Sci., 24, 219-230 (1982). 57. C.R. Calladine, 'Modal stiffnesses of a pre-tensioned cable net', Int. ... 110. C.R. Calladine, "Some paradoxical experiments on beams". International Journal of Mechanical Engineering Education, 24, 37-48 (1996).
  23. D:CURRENT_WORKMEMBRANE VIBRATION IN AIRSDM PAPERSDM_PAPER.DVI

    www-civ.eng.cam.ac.uk/dsl/publications/AIAA2002-1368.pdf
    18 Feb 2002: ma =ρ. k2s ω2airρ/B(24). If there is air on both sides of the membrane, the sameanalysis can be repeated to obtain an equation like(24), but with a factor ... 57.0 -4.24 84.4 70.2 67.1 -4.45 90.8 86.6 79.9 -7.7.
  24. A New Technique for Simulation of Collapseof a Tunnel ...

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR286.pdf
    7 May 2002: The solenoid valves could be operated by a 24 V d.c. ... Page 17. Technical Report No. CUJZD/D&ils/TR286 Sharma & Bolton. 3 028 - EJ Without any surface water26 -24 -. With surface water. 2 1 8E 16z 1 4. 121086420.
  25. Chris Burgoyne Publications Page

    www-civ.eng.cam.ac.uk/cjb/cjbpublications.html
    4 Oct 2011: theory. Journ. Solids & Structures, 32/24, 3573-3588, 1995. Lees J.M., Gruffydd-Jones B. ... of Bone and Mineral Research, 24/11, 1808-1818, 2009. doi: 10.1359/JBMR.090504.
  26.  

    www-civ.eng.cam.ac.uk/dsl/publications.html
    19 Feb 2008: AIAA Balloon Systems Conference, 21-24 May, 2007, Williamsburg, VA, AIAA-2007-2632. (paper.pdf). ... AIAA Balloon Systems Conference, 21-24 May, 2007, Williamsburg, VA, AIAA-2007-2606. (paper.pdf).
  27. Publications / Presentations

    www-civ.eng.cam.ac.uk/geotech_new/people/lynch/pubrl.html
    7 Mar 2002: Unicam Application note. 24. N Perez-Souto, R J Lynch, G Measures and J T Hann, " Use of high performance liquid chromatographic peak deconvolution and peak labelling to identify antiparasitic components
  28. The Ageing and Creep of Dense Granular Materials

    www-civ.eng.cam.ac.uk/geotech_new/publications/abstracts/abst-deeks.html
    17 Oct 2008: In the first test series 24 pile installations were conducted that simulated axial-jacking.
  29. frprcs9final00067

    www-civ.eng.cam.ac.uk/cjb/papers/cp85.pdf
    26 Mar 2010: The stress steps were chosen to give failure after about 24 hours so that a daily cycle of tests could be performed.
  30. In-Situ Photocatalytic Remediation of Organic Contaminants in…

    www-civ.eng.cam.ac.uk/geotech_new/publications/abstracts/abst-Lim.html
    22 Jun 2010: The same set of catalyst and 15 W Philips Cleo UVA fluorescent lamp was operated for a total of about 582 h (24 d) out of the cumulative 1039 h (43
  31. FRPRCS-8 Full Paper Format

    www-civ.eng.cam.ac.uk/cjb/concplas/19prakhya.pdf
    12 Jul 2007: 06 71.20 0.24 1.09 15.10 2.21 DG2 0.90 0.25 2.10 2.16 9.67 0.68 0.03 0.00 DG3 1.47 ... 29 1.86 0.88 0.94 0.90 DG11 1.24 0.06 1.87 2.29 0.84 1.0 3.53 0.29 DG12 1.24 0.90
  32. Durability and Mechanical Properties of Deep-Mixed Clays

    www-civ.eng.cam.ac.uk/geotech_new/publications/abstracts/abst-osman_abir.html
    10 Jul 2007: Furthermore, allowing the bentonite to hydrate for 24 hours or using a high shear mixer to mix the bentonite yielded much higher strengths and lower permeabilities at all ages for the
  33. paper.dvi

    www-civ.eng.cam.ac.uk/dsl/publications/balloons.pdf
    8 Feb 2000: 24. L2. h2B. 2(15). and. v =h 2. 24. L2. h2 B. ... u v = 2. h 2. 24. L. h. 2(19). u2 v2 =. h 2. 24. 2 L. h. 4B2 2. 4(20). Substituting back into Equation 18, ignoring higherorder terms, and
  34. Burgoynefinal2

    www-civ.eng.cam.ac.uk/cjb/papers/cp91.pdf
    8 Apr 2011: Careful choice of temperature step and step duration allow the test to be completed in about 24 hours. ... van Leeuwen J. and Siemes A.J.M. (1979). Miner's rule with respect to plain concrete, Heron, 24(1),1–34 Yamaguchi, T., Kato Y., Nishimura T.
  35. E:CURRENT_WORKCRTS TECHNOLOGYREPORT.DVI

    www-civ.eng.cam.ac.uk/dsl/publications/TR195.pdf
    5 Apr 2001: Configuration 12 13.4. 24 3.6. Circular 6 45.9. Configuration 12 12.5. ... apertures of 1, 3, 5, and 10 m, with 6, 12, and 24 ribs.
  36. FRPRCS-8 Full Paper Format

    www-civ.eng.cam.ac.uk/cjb/concplas/10ibell.pdf
    25 Jul 2007: Figure 24 demonstrates its implementation. This system was shown to be practical and even more effective than the equivalent near-surface mounted (NSM) strengthening scheme due to there being no possibility ... Drilled holes Injected paste. Strengthening
  37. IStructE 2003 Poster

    www-civ.eng.cam.ac.uk/dsl/ppao2/documents/IStructE_2003_Poster.pdf
    22 May 2003: 4 8 12 16 20 24 28 32 36 401.0. 1.1.
  38. C:\Documents and Settings\Sergio\My Documents\Papers\Wrinkled…

    www-civ.eng.cam.ac.uk/dsl/publications/Barcelonapaper.pdf
    24 Apr 2003: λ(δ1 δ2)π. (24). Here δ1 and δ2 are the radial displacements of the corners loaded by T1 and T2, respectively;these corner displacements can be estimated from. ... The wavelength predictions are very close.The wrinkle amplitudes have been estimated
  39. 021004_GIANNOPOULOS

    www-civ.eng.cam.ac.uk/cjb/papers/cp90.pdf
    26 Mar 2010: 0 500 1000 1500 2000 250020. 22. 24. 26. 28. 30.
  40. SE1 p1 Cover

    www-civ.eng.cam.ac.uk/cjb/papers/p48.pdf
    3 Feb 2004: 24|The Structural Engineer – 6 January 2004. paper: burgoyne. Fig 10 shows the load factor that should be applied to theexternal load so that the bottom steel is sufficient to carry
  41. Proceedings of the Institution of Civil Engineers Geotechnical…

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/218%20corrigendum.pdf
    28 Nov 2013: On page 243 line 24 equation 40 not 39 should be referred to.
  42. 20 Mar 2000: The Storchen Bridge in Wintherthur,Switzerland, with a total length of 124 m has two of its 24 cables madefrom carbon fibres [18]. ... 23] HAY, J. Response of Bridges to Wind.HMSO, London, 1992. [24] SHEARD P.
  43. t2012-023 631..631

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/212_corrigendum.pdf
    28 Nov 2013: 24], [26], and [28] should read:. 24 q6cu. 12. 1:35w. gM2D.
  44. reporthomo

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR330.pdf
    27 Oct 2004: Figure 24: Stress cell measurements in test BG-03 for 50Hz frequency. ... 20. 21. 22. 23. 24. 25. 26. 2. 4. 3. 5.
  45. 10853_2006_1360_42_8-web 2867..

    www-civ.eng.cam.ac.uk/cjb/papers/p58.pdf
    10 Sep 2008: 747 22,000 93,600 92.36 1.8 13.70 2.6337 0.658 24,800 77,000 88.54 2.4 13.87 2.5. ... Temperature (C) k1 for PET1(1/day) 10–6. k1 for PET2(1/day) 10–6. 50 0.186 0.38870 1.480 3.92085 11.50 24.60.
  46. report_final.dvi

    www-civ.eng.cam.ac.uk/dsl/publications/TR192.pdf
    21 Mar 2001: 2.24). wherefromYoung(1989p.68). I x. =. R3t. 1. 3t 2R+. t2 R2. ... The transformation of the nodal coordinates is2. 4XYZ. 35 =. 24 cos sin 0sin cos 0.
  47. jbmr0811763 1808..1818

    www-civ.eng.cam.ac.uk/cjb/papers/p66.pdf
    19 Mar 2010: measurement in the biopsy samples, and there was nosignificant effect of case-ness (n = 39, r2adj = 0.24). ... J Bone Joint Surg Am58:82–86. 24. Carter DR, Hayes WC 1977 The compressive behavior ofbone as a two-phase porous structure.
  48. ACM-186

    www-civ.eng.cam.ac.uk/cjb/papers/cp67.pdf
    20 Jul 2004: The motorway has 3 lanes in each direction, of which 2 were assumed closed between 0:00-6:00 and 19:00-24:00, and one from 6:00-16:00, ... 5. 0 5 10 15 20 24. -4.5. -4. -3.5. -3.
  49. report1.dvi

    www-civ.eng.cam.ac.uk/dsl/publications/TR170.pdf
    21 Mar 2001: TB =. 1. 24. 24b1 0 b2 0 b3 00 c1 0 c2 0 c3c1 b1 c2 b2 c3 b3. ... Figure 3.2: Equilibrium surface. 24. 0.2 0.1 0 0.1 0.2. 0.1.
  50. D:\Papers\Optimization cover plates\cover-plates-paper.dvi

    www-civ.eng.cam.ac.uk/dsl/publications/cover-plates-paper.pdf
    10 Jan 2004: US Patent,. 4,942,700. July 24, 1990. [5] Hoberman C. Radial expansion/retraction truss structures. ... mization. International Journal for Numerical Methods in Engineering 1987, 24:359–. 373.
  51. Osman, A. S., Mair, R. J. & Bolton, M. ...

    www-civ.eng.cam.ac.uk/geotech_new/people/bolton/mdb_pub/176.pdf
    16 Nov 2006: 2.89 3.13 1.76 1.99 0.62 0.841 4.46 4.76 3.35 3.64 2.24 2.51 1.11 1.37. ... 2.72 22.450.5 9.62 9.72 6.39 6.53 3.15 3.34 0.11 0.140.75 12.10 12.24 8.88 9.06

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.