Search
Search Funnelback University
- Refined by:
- Date: 2021
1 -
7 of
7
search results for `download the full case study`
Fully-matching results
-
Layout 1
https://www-smartinfrastructure.eng.cam.ac.uk/files/2017_pile_study.pdf26 Apr 2021: However, in this case,there is a clear rise in peak temperature at about 17m depth. ... However, the real difference withDFOS is the provision of a continuous profile of data down the full pile length, not just atdiscrete locations. -
Transforming infrastructure through smarter information24 Benefit to…
https://www-smartinfrastructure.eng.cam.ac.uk/files/case_1_-_2018.pdf23 Apr 2021: to represent near real-time status, workingcondition and/or position of the physical asset. ... Case study 1. Figure 4: Digital Twin Vision. Bentley Systems, working together with Topcon, and GeoSLAMexpect to further advance the extent of data captured -
Layout 1
https://www-smartinfrastructure.eng.cam.ac.uk/files/2017_sprayed_concrete.pdf26 Apr 2021: Case study 4. Figure 1. Model of the western end of Liverpool Street station and enlargement chamber CH5. ... is unlikely to benecessary beyond the first 3m either side of the openings. -
Layout 1
https://www-smartinfrastructure.eng.cam.ac.uk/files/2017_abbey_mills_case_study.pdf26 Apr 2021: The wallmovements were compared to numerical predictions obtained from anumerical parametric study using FLAC2D software. ... Case study 5. Installation of reinforcement cage with fibre optic cables. -
Benefit to Asset operators and managers, BIM managers Impact ...
https://www-smartinfrastructure.eng.cam.ac.uk/files/case_3_-_2018.pdf26 Apr 2021: Case study 3. Figure 2: CSIC's sytematic approach integrating five interconnected models. ... The methodology was initially applied on a case study withHertfordshire County Council on the Hailey Link and Stansted roadbridges along the A10. -
Transforming infrastructure through smarter information26 Autonomous…
https://www-smartinfrastructure.eng.cam.ac.uk/files/case_2_-_2018.pdf23 Apr 2021: The camera position and orientationare determined using a calibration process with a reference object. ... Case study 2. The proposed method is based on the following geometric principle:when a camera is properly mounted at the height of the -
Layout 1
https://www-smartinfrastructure.eng.cam.ac.uk/files/2017_smartplank_study.pdf26 Apr 2021: Additionally, a numerical modelling study of SmartPlank wasundertaken and compared to the field test results. ... Case study 3. Figure 3. Deployed SmartPlank at TCR Stair 14.
Search history
Recently clicked results
Recently clicked results
Your click history is empty.
Recent searches
- `Robert Watson` (2) · moments ago
Recent searches
Your search history is empty.