Search
Search Funnelback University
- Refined by:
- Date: 2024
1 -
10 of
30
search results for `download the full case study` |u:www-smartinfrastructure.eng.cam.ac.uk
Fully-matching results
-
Inside concrete | Cambridge Centre for Smart Infrastructure and…
https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/inside-concrete26 Jun 2024: This enables a better evaluation and assessment of the integrity of a concrete structure. ... Download the full case studyContact us. Centre for Smart Infrastructure and Construction (CSIC). -
Construction's ongoing journey to net zero | Cambridge Centre for …
https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/constructions-ongoing-journey-net-zero26 Jun 2024: ACORN, which began in early 2019, continues through 2021 and aims to deliver a prototype structure that will act as a full-scale demonstrator for the research. ... Download the full case study here. -
Monitoring performance of reinforced concrete piles | Cambridge…
https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2017-case-studies/monitoring-performance-reinforced-concrete-piles26 Jun 2024: the pile, confirming the presence of a very localised weak spot in the pile (Figure 1b - download the full case study to see the figure). ... around a tenth of a millimetre (Figure 1c - download the full case study to see the figure). -
Optimising the design of sprayed concrete linings | Cambridge Centre…
https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2017-case-studies/optimising-design-sprayed-concrete-linings26 Jun 2024: and monitor the behaviour of sprayed concrete linings (SCL), a technique used to construct the station tunnels on the Crossrail project. ... DFOS installation. CSIC embedded a DFOS system within the thickened SCL in enlargement chamber CH5 (Figure 1 – -
Safety performance of timber structures in underground construction…
https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2017-case-studies/safety-performance-timber-structures-underground26 Jun 2024: Figure 2 (download full case study to see figure) gives a picture of SP52 installed at Stair 14 TCR. ... Download the full case study. -
The transformation of a historic urban quarter | Cambridge Centre for …
https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2014-case-studies/transformation-historic-urban-quarter26 Jun 2024: The case study benefits from a historic perspective from the 1870s, which we have built up using similar data to our West London study. ... Download the full case study here. -
Translucent City - transforming the use of underground space |…
https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2017-case-studies/translucent-city-transforming-use-underground-space26 Jun 2024: provide cross-disciplinary study that integrates the subterranean part of a city with the above ground ‘visible’ systems – an area of research that has, until now, been under examined. ... Download the full case study here. -
Investigating the role of the digital twin in optimising asset value…
https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2018-case-studies/investigating-role-digital-twin-optimising-asset-value26 Jun 2024: level of detail, and BIM models of specific areas in the IfM with highly detailed information (Figure 1 and Figure 2 - download the full case study to see all the figures). ... develop novel applications (the ‘APP STORE’ in Figure 4 - download the -
Adaptive zoning: quantifying costs and benefits of major transport…
https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2015-case-studies/adaptive-zoning-quantifying-costs-and-benefits-major26 Jun 2024: Impact and benefits. CSIC’s new adaptive zoning method:. Enhances spatial economic and transport modelling, making it possible to model in much higher spatial resolutions, while allowing a radically expanded study ... Download the full case -
Multi-dimensional simulation of underground spaces coupled with…
https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2016-case-studies/multi-dimensional-simulation-underground-spaces-coupled26 Jun 2024: Harnesses the passenger thermal comfort in the London Underground and alleviates overheating problems in the summer. ... CSC team: Adnan Mortada, Dr Ruchi Choudhary, Professor Kenichi Soga. Download the full case study here.
Search history
Recently clicked results
Recently clicked results
Your click history is empty.
Recent searches
Recent searches
Your search history is empty.