Search

Search Funnelback University

Search powered by Funnelback
11 - 20 of 37 search results for `Download the full case` |u:www-smartinfrastructure.eng.cam.ac.uk
  1. Fully-matching results

  2. Closing the loop: back analysis of sprayed concrete tunnel junctions…

    https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/closing-loop-back-analysis-sprayed-concrete-tunnel-junctions
    6 Jul 2024: Closing the loop. To realise the full value of these high-resolution measurements, back-analyses and comparison of measurements with current design methods is required. ... Download the full case study here.
  3. Integrating infrastructure information for efficient whole-life asset …

    https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2018-case-studies/integrating-infrastructure-information-efficient-whole
    6 Jul 2024: Detailed industry case studies are being developed with English Heritage and University of Cambridge Estate Management to demonstrate the methodologies developed in this research. ... Download the full case study here.
  4. CSIC and Cementation Skanska - when project collaboration becomes…

    https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2016-case-studies/csic-and-cementation-skanska-when-project-collaboration
    6 Jul 2024: Cementation Skanska now has a full and independent commercial capability to deliver distributed fibre optic sensors. ... Download the full case study here.
  5. Innovation in sensing to monitor the influence of tunnelling under…

    https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2018-case-studies/innovation-sensing-monitor-influence-tunnelling-under
    6 Jul 2024: The system has been live since July 2017 and has required minimal maintenance. ... Download the full case study with figures here.
  6. Keeping cities moving through integrating smart solutions | Cambridge …

    https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2017-case-studies/keeping-cities-moving-through-integrating-smart
    6 Jul 2024: This novel framework offers a wide range of valuable applications including, for example, how high speed rail usage has evolved in the case of HS1 in the UK and what implications ... Download the full case study here.
  7. Planning in 3D: Optimising space and resources in city heat sources…

    https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2018-case-studies/planning-3d-optimising-space-and-resources-city-heat
    6 Jul 2024: Below ground. Geology is a significant consideration in the development of the cityscape. ... Download the full case study here.
  8. Transforming infrastructure through smarter information24 Benefit to…

    https://www-smartinfrastructure.eng.cam.ac.uk/files/case_1_-_2018.pdf
    23 Apr 2021: to represent near real-time status, workingcondition and/or position of the physical asset. ... Case study 1. Figure 4: Digital Twin Vision. Bentley Systems, working together with Topcon, and GeoSLAMexpect to further advance the extent of data captured
  9. Autonomous vision-based bridge and tunnel strike prevention system…

    https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2018-case-studies/autonomous-vision-based-bridge-and-tunnel-strike
    6 Jul 2024: The latter two aspects of OHVS management are effectively managed by existing systems. ... Download the full case study.
  10. Benefit to Asset operators and managers, BIM managers Impact ...

    https://www-smartinfrastructure.eng.cam.ac.uk/files/case_3_-_2018.pdf
    26 Apr 2021: Also, the tool required future-proofing for extension beyond Level 2. In order to develop the tool and make it effective and useful toindustry, diverse case studies were identified from a ... The methodology was initially applied on a case study
  11. Investigating the role of the digital twin in optimising asset value…

    https://www-smartinfrastructure.eng.cam.ac.uk/projects-and-case-studies/2018-case-studies/investigating-role-digital-twin-optimising-asset-value
    6 Jul 2024: level of detail, and BIM models of specific areas in the IfM with highly detailed information (Figure 1 and Figure 2 - download the full case study to see all the figures). ... develop novel applications (the ‘APP STORE’ in Figure 4 - download the

Related searches for `Download the full case` |u:www-smartinfrastructure.eng.cam.ac.uk

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.