Search

Search Funnelback University

Search powered by Funnelback
1 - 6 of 6 search results for `Download the full` |u:www-smartinfrastructure.eng.cam.ac.uk
  1. Fully-matching results

  2. Layout 1

    https://www-smartinfrastructure.eng.cam.ac.uk/files/2017_sprayed_concrete.pdf
    26 Apr 2021: is unlikely to benecessary beyond the first 3m either side of the openings. ... costs with the additional benefits ofimproved safety, reduced carbon emissions and shorter constructiontimes.
  3. Layout 1

    https://www-smartinfrastructure.eng.cam.ac.uk/files/2017_pile_study.pdf
    26 Apr 2021: Here, data from a compression test pile show the concretecuring temperature at regular intervals. ... However, the real difference withDFOS is the provision of a continuous profile of data down the full pile length, not just atdiscrete locations.
  4. Benefit to Asset operators and managers, BIM managers Impact ...

    https://www-smartinfrastructure.eng.cam.ac.uk/files/case_3_-_2018.pdf
    26 Apr 2021: determine the most optimal timing for interventions ontheir bridge portfolio in a predictive manner. ... The available tools in the market have a time-dependent strategybased on experience.
  5. Layout 1

    https://www-smartinfrastructure.eng.cam.ac.uk/files/2017_abbey_mills_case_study.pdf
    26 Apr 2021: Baseline readings were takenbefore and during shaft excavation until the final excavation depth wasreached. ... In addition, manual inclinometers wereinstalled in the diaphragm walls of the shaft to measure walldeflections.
  6. Layout 1

    https://www-smartinfrastructure.eng.cam.ac.uk/files/2017_smartplank_study.pdf
    26 Apr 2021: the expected rise in passenger numbers interchangingbetween London Underground services and Crossrail in2018. ... The instrumented SmartPlanks were thenwrapped with tape to protect them from any physicaldamage.
  7. Transforming infrastructure through smarter information26 Autonomous…

    https://www-smartinfrastructure.eng.cam.ac.uk/files/case_2_-_2018.pdf
    23 Apr 2021: The camera position and orientationare determined using a calibration process with a reference object. ... The collision report (video segment,license plate, and accelerometer data) is sent to the relevantauthorities.

Refine your results

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.