Search
Search Funnelback University
- Refined by:
- Date: 2021
1 -
7 of
7
search results for `download the full` |u:www-smartinfrastructure.eng.cam.ac.uk
Fully-matching results
-
Layout 1
https://www-smartinfrastructure.eng.cam.ac.uk/files/2017_sprayed_concrete.pdf26 Apr 2021: is unlikely to benecessary beyond the first 3m either side of the openings. ... costs with the additional benefits ofimproved safety, reduced carbon emissions and shorter constructiontimes. -
Layout 1
https://www-smartinfrastructure.eng.cam.ac.uk/files/2017_pile_study.pdf26 Apr 2021: Here, data from a compression test pile show the concretecuring temperature at regular intervals. ... However, the real difference withDFOS is the provision of a continuous profile of data down the full pile length, not just atdiscrete locations. -
Transforming infrastructure through smarter information24 Benefit to…
https://www-smartinfrastructure.eng.cam.ac.uk/files/case_1_-_2018.pdf23 Apr 2021: to represent near real-time status, workingcondition and/or position of the physical asset. ... Figure 3: Snapshot of the mobile scan of the IfM and surrounding areaperformed by Topcon. -
Benefit to Asset operators and managers, BIM managers Impact ...
https://www-smartinfrastructure.eng.cam.ac.uk/files/case_3_-_2018.pdf26 Apr 2021: determine the most optimal timing for interventions ontheir bridge portfolio in a predictive manner. ... The available tools in the market have a time-dependent strategybased on experience. -
Layout 1
https://www-smartinfrastructure.eng.cam.ac.uk/files/2017_abbey_mills_case_study.pdf26 Apr 2021: Baseline readings were takenbefore and during shaft excavation until the final excavation depth wasreached. ... In addition, manual inclinometers wereinstalled in the diaphragm walls of the shaft to measure walldeflections. -
Layout 1
https://www-smartinfrastructure.eng.cam.ac.uk/files/2017_smartplank_study.pdf26 Apr 2021: the expected rise in passenger numbers interchangingbetween London Underground services and Crossrail in2018. ... The instrumented SmartPlanks were thenwrapped with tape to protect them from any physicaldamage. -
Transforming infrastructure through smarter information26 Autonomous…
https://www-smartinfrastructure.eng.cam.ac.uk/files/case_2_-_2018.pdf23 Apr 2021: The camera position and orientationare determined using a calibration process with a reference object. ... The collision report (video segment,license plate, and accelerometer data) is sent to the relevantauthorities.
Search history
Recently clicked results
Recently clicked results
Your click history is empty.
Recent searches
- `excellence in scholarship` |u:www.chu.cam.ac.uk (4) · moments ago
Recent searches
Your search history is empty.