Search
Search Funnelback University
- Refined by:
- Date: 2021
- Format: text/html
1 -
4 of
4
search results for `Building Sidgwick`
Fully-matching results
-
Masterplan Volume 2 | Sidgwick Site
https://www.sidgwick.sitedevelopments.cam.ac.uk/vision/masterplan-volume-29 Nov 2021: Search site. Sidgwick Site. Masterplan Volume 2. This document assesses potential opportunities to make better use of existing space within each building on the Sidgwick Site. ... The studies involve a consideration of the following four space uses -
Background | Sidgwick Site
https://www.sidgwick.sitedevelopments.cam.ac.uk/background5 Nov 2021: Faculty of English (2004, by Allies and Morrison) and the most recent Alison Richard Building (2012, by Nicholas Hare Architects). ... While available space for further development on the Sidgwick site is limited, there are still areas that hold -
Renovation works start on Sidgwick Lecture Block | For staff
https://www.staff.admin.cam.ac.uk/general-news/renovation-works-start-on-sidgwick-lecture-block30 Jul 2021: Built in 1959, the Sidgwick Lecture Block is one of the University’s principal teaching hubs, used by many faculties and departments and for examinations. ... The budget for this work is £9.274m, to be met from the PRC’s Investment Fund (former -
Masterplan Volume 3 | Sidgwick Site
https://www.sidgwick.sitedevelopments.cam.ac.uk/vision/masterplan-volume-39 Nov 2021: Search site. Sidgwick Site. Masterplan Volume 3. Stirling Building [photo by Allies and Morrison]. ... collections. Consider whether improvements would enable the History Faculty to remain in the building.
Search history
Recently clicked results
Recently clicked results
Your click history is empty.
Recent searches
Recent searches
Your search history is empty.