Search

Search Funnelback University

Search powered by Funnelback
161 - 180 of 430 search results for Economics test |u:www-civ.eng.cam.ac.uk where 31 match all words and 399 match some words.
  1. Results that match 1 of 2 words

  2. Cambridge University Engineering Dept. - Structures Group

    www-civ.eng.cam.ac.uk/abstract/loweabs.htm
    13 Nov 2003: The experimental tests demonstrated that reinforced concrete beam-and-slab decks might be capable of carrying additional load beyond this point. ... Post-test NLFE analyses were also carried out using more rigorously defined tension stiffening curves as
  3. 30 Sep 2002: However, experiments and full-scale load tests confirm that bridges are often able to carry loads well in excess of the theoretical capacity calculated using this approach.
  4. Cambridge University Engineering Dept. - Structures Group

    www-civ.eng.cam.ac.uk/abstract/weerasingheabs.html
    17 Apr 2001: The work carried out on this test specimen included the preliminary analysis, its construction and assembly, and a series of tests performed during both the non-composite and the composite stages. ... An advanced three-dimensional finite-element model of
  5. reporthomo

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR330.pdf
    27 Oct 2004: The test series. involved 4 saturated tests and their general configuration is presented in Table 1. ... Figure 6 shows. the post-test observations for tests BG-02 and BG-03.
  6. CUED Structures Group Theses - Ashour

    www-civ.eng.cam.ac.uk/abstract/afaabs.htm
    10 Nov 2003: A series of tests on reinforced concrete continuous deep beams was performed to aid in the development of such models. ... Present codes of practice (ACI 318-89 and CIRIA Guide 2) for continuous deep beams showed little agreement when compared to test
  7. Cambridge University Engineering Dept. - Structures Group

    www-civ.eng.cam.ac.uk/abstract/tanabst.htm
    7 Nov 2003: Modal tests are carried out on the mast to establish the variation of modal parameters with prestress levels, input force amplitudes, and gravity orientation. ... The dynamic model is validated against the experimental observations from the modal tests.
  8. CUED Structures Group Theses - Kwan

    www-civ.eng.cam.ac.uk/abstract/kwanabs.htm
    13 Nov 2003: Tests on the length and shape accuracy of the mast have also been performed and recorded. ... Collectively, these tests showed some important characteristics of the proposed mast.
  9. CUED Bridge Research

    www-civ.eng.cam.ac.uk/brg/brg.htm
    27 Sep 2002: This involves looking at the effect of uncertainty in non-destructive test methods on the decisions made with relation tobridge safety and also on bridge maintenance and repair actions.
  10. CUED Structures Group Theses - Ibell

    www-civ.eng.cam.ac.uk/abstract/tjiabs.htm
    23 Sep 1998: To provide a basis against which such theoretical models could be validated, a series of tests on concrete prisms, with and without steel reinforcement, and strip-loaded through rigid plates, was ... The method was shown to be capable of predicting both
  11. CUED home page - W Huang: actuator.html

    www-civ.eng.cam.ac.uk/dsl/sma/actuator.html
    21 Jul 1998: Several tests were carried out on this one-way actuator, both in the one-disk and three disk configurations. ... Working torques used in the test varied from -0.2 Nm to 0.62 Nm.
  12. CUED Structures Group Theses - El-Sheikh

    www-civ.eng.cam.ac.uk/abstract/aiesabs.htm
    10 Nov 2003: A series of full-scale tests has been carried out on three double-layer square-on-square space trusses including two non-composite and one composite truss. ... A series of tests was also carried out on CSF nodes and splices in order to develop a
  13. Cambridge University Engineering Dept. - Structures Group

    www-civ.eng.cam.ac.uk/abstract/wattabs.html
    12 Dec 2003: Analyses of the deployment moment, buckling moment and. stiffness are made and then compared to experimental tests. ... measured from experimental tests. A review of damping methods used in deployable structures and their applicability to structures with
  14. Cambridge University Engineering Dept. - Structures Group

    www-civ.eng.cam.ac.uk/abstract/fischerabs.htm
    10 Aug 2004: Gravity Compensation of Deployable Space Structures. Annette Fischer. Abstract:. Gravity compensation suspension systems are essential to support space structures during tests on Earth, but also impose constraints on the structures that ... A
  15. Cam Middleton: Research

    www-civ.eng.cam.ac.uk/struct/crm/research.html
    3 Nov 2010: These tests have included a series of half-scale beam-and-slab bridge tests funded by EPSRC and the Highways Agency and 20 scale models of concrete bridges.
  16. Cambridge University Engineering Dept. - Structures Group

    www-civ.eng.cam.ac.uk/abstract/mandalabs.htm
    25 Nov 1998: line through the large quantity of test data in the literature has also a slope of approximately 1.5. ... The most obvious explanation of the difference is that the open-topped shells in the present study are Ôstatically determinateÕ, whereas the usual
  17. Deployable Tensegrity Structures for Space Applications

    www-civ.eng.cam.ac.uk/dsl/publications/TibertDocThesis.pdf
    30 Jul 2002: A physicalmodel is built to analyse the feasibility of the concept and to test various deploy-ment schemes. ... A physicalmodel is built to analyse the feasibility of the concept and to test various deploymentschemes.
  18. Concrete Bridge Assessment Using Plastic Collapse Analysis…

    www-civ.eng.cam.ac.uk/brg/papers/brgsrv98/plaintbl.html
    12 Aug 1998: Hudson tests Kite tests Test No. H1 H2 H3 H4 K1 K2 K3 K4 Ptest (kN) 29.2 28.3 27.9 19.0 23.4 23.5 24.1 ... 1.05 1.18 1.28 Collins tests Antill tests Test No.
  19. Data Report Of Three Dynamic Centrifuge Model Test On ...

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR206.pdf
    27 Jan 2009: The sand used in all these tests was dry. Leighton Buzzard sand 52/100 (nominal grain size 0.225mm) was used for one of these test. ... tables 6,8 and 10a,b, for tests AM-1,AM-2 and test AM-3 respectively.
  20. Cambridge University Engineering Dept. - Structures Group

    www-civ.eng.cam.ac.uk/abstract/leungabst.htm
    13 Nov 2003: In order to illustrate the accuracy of the present model, a series of compression tests on concrete specimens with either single spiral or interlocking spirals were carried out, and good consistency
  21. Cambridge University Engineering Dept. - Structures Group

    www-civ.eng.cam.ac.uk/abstract/hackabs.htm
    10 Nov 2003: behaviour. Quasi-static and dynamic tests show significant non-linear coupling between piezoelectricity and the applied stress.

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.