Search

Search Funnelback University

Search powered by Funnelback
161 - 170 of 430 search results for Economics test |u:www-civ.eng.cam.ac.uk where 31 match all words and 399 match some words.
  1. Results that match 1 of 2 words

  2. Cambridge University Engineering Dept. - Structures Group

    www-civ.eng.cam.ac.uk/abstract/loweabs.htm
    13 Nov 2003: The experimental tests demonstrated that reinforced concrete beam-and-slab decks might be capable of carrying additional load beyond this point. ... Post-test NLFE analyses were also carried out using more rigorously defined tension stiffening curves as
  3. 30 Sep 2002: However, experiments and full-scale load tests confirm that bridges are often able to carry loads well in excess of the theoretical capacity calculated using this approach.
  4. Cambridge University Engineering Dept. - Structures Group

    www-civ.eng.cam.ac.uk/abstract/weerasingheabs.html
    17 Apr 2001: The work carried out on this test specimen included the preliminary analysis, its construction and assembly, and a series of tests performed during both the non-composite and the composite stages. ... An advanced three-dimensional finite-element model of
  5. reporthomo

    www-civ.eng.cam.ac.uk/geotech_new/publications/TR/TR330.pdf
    27 Oct 2004: The test series. involved 4 saturated tests and their general configuration is presented in Table 1. ... Figure 6 shows. the post-test observations for tests BG-02 and BG-03.
  6. CUED Structures Group Theses - Ashour

    www-civ.eng.cam.ac.uk/abstract/afaabs.htm
    10 Nov 2003: A series of tests on reinforced concrete continuous deep beams was performed to aid in the development of such models. ... Present codes of practice (ACI 318-89 and CIRIA Guide 2) for continuous deep beams showed little agreement when compared to test
  7. Cambridge University Engineering Dept. - Structures Group

    www-civ.eng.cam.ac.uk/abstract/tanabst.htm
    7 Nov 2003: Modal tests are carried out on the mast to establish the variation of modal parameters with prestress levels, input force amplitudes, and gravity orientation. ... The dynamic model is validated against the experimental observations from the modal tests.
  8. CUED Structures Group Theses - Kwan

    www-civ.eng.cam.ac.uk/abstract/kwanabs.htm
    13 Nov 2003: Tests on the length and shape accuracy of the mast have also been performed and recorded. ... Collectively, these tests showed some important characteristics of the proposed mast.
  9. CUED Bridge Research

    www-civ.eng.cam.ac.uk/brg/brg.htm
    27 Sep 2002: This involves looking at the effect of uncertainty in non-destructive test methods on the decisions made with relation tobridge safety and also on bridge maintenance and repair actions.
  10. CUED Structures Group Theses - Ibell

    www-civ.eng.cam.ac.uk/abstract/tjiabs.htm
    23 Sep 1998: To provide a basis against which such theoretical models could be validated, a series of tests on concrete prisms, with and without steel reinforcement, and strip-loaded through rigid plates, was ... The method was shown to be capable of predicting both
  11. CUED home page - W Huang: actuator.html

    www-civ.eng.cam.ac.uk/dsl/sma/actuator.html
    21 Jul 1998: Several tests were carried out on this one-way actuator, both in the one-disk and three disk configurations. ... Working torques used in the test varied from -0.2 Nm to 0.62 Nm.

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.