Search

Search Funnelback University

Search powered by Funnelback
41 - 60 of 89 search results for Economics test |u:www3.eng.cam.ac.uk where 11 match all words and 78 match some words.
  1. Results that match 1 of 2 words

  2. FFinstructions_junior

    www3.eng.cam.ac.uk/outreach/Project-resources/Senior-glider/FFinstructions.pdf
    6 Jan 2010: 3. Now test your fun flyer in the flying zone! Top Tip: Think about how hard you should throw the glider.
  3. instructionsheet

    www3.eng.cam.ac.uk/outreach/Project-resources/Krazy-kit-cars/instructions.pdf
    11 Oct 2011: 5. TEST! www.eng.cam.ac.uk/outreach. motor. rubber band. pulley. drivewheel. axle. motor plastic tubing.
  4. Dambusters documentary recr...

    www3.eng.cam.ac.uk/~hemh1/dambusters/Mail_3May.pdf
    3 May 2011: He started by firing cricket balls from a bowling machine at the Jesus Green open air swimming pool inCambridge to test Hutchings' theories. ... Dr Hunt added: 'Our pilots had no-one shooting at them, the engineers could use things like bowlingmachines
  5. Bridge_instructions

    www3.eng.cam.ac.uk/outreach/Project-resources/Bridges(KS3)/Bridge_instructions.pdf
    2 Mar 2010: 5. Test! The engineer will measure the maximum load taken and the mass of your bridge.
  6. Hugh Hunt Consultancies

    www3.eng.cam.ac.uk/~hemh1/consultancies.htm
    10 Sep 2016: tuned vibration absorber for a vibration testing machine;. vibration testing machines and engine test-bed vibrations;.
  7. Paper8_EP2_2014

    www3.eng.cam.ac.uk/~hemh1/climate/Paper8_EP2_2014.pdf
    9 May 2014: 10m diameter) with reference to their applications and economic favourability. As a point of reference.
  8. Final Equipment List

    www3.eng.cam.ac.uk/outreach/Project-resources/Rocket-car-derby/Equipment-List.pdf
    12 Oct 2011: 2 launch bases for flexible hose 5 launchers 5 control boxes 5 test tubes 5 poles spare pp9 batteries rings of “fire”!
  9. I hereby declare that, except where specifically indicated, the ...

    www3.eng.cam.ac.uk/~hemh1/theses/Richard_Shaw.pdf
    25 Jun 2012: Larger-scale outdoor tests using kites were performed in an effort to represent the. ... suspension bridges4. Figure 2. 15 metre diameter balloon test-bed. Video Capture for a Tethered Balloon.
  10. “Walking Robot Project”

    www3.eng.cam.ac.uk/outreach/Project-resources/Walking-robot/2003robot-intro-presentation.pdf
    12 Oct 2011: “Robot Sprint Project”. Headstart 2003. Challenge. • Design• Build• Test. • Practical• Teams• FUN!
  11. Fleck60JPMSRevised.dvi

    www3.eng.cam.ac.uk/~sdg/preprint/orthotropic.pdf
    13 Apr 2022: Left, blue curve is experimental test, repeated twice (red/green dots):grey curve is FEA for wire supports able to move out of plane in Fig. ... structural tests of axially loaded, orthotropic thin-walled open tubes. Acknowledgments: this project is
  12. 13 Apr 2022: 2.6.2 Frame with 6 revolute joints. A number of variants of three-dimensional models were built and simulated inorder to test new theories and designs. ... A dynamic deployment test of this model was made. The heavy weight ofthe beam members and multiple
  13. hovermagic_instructionsII

    www3.eng.cam.ac.uk/outreach/Project-resources/Hovermagic/hovermagic_instructions.pdf
    12 May 2010: TEST! LIFT AND THRUST. Top Tip: Take care so that the air doesn’t escape from the sides of your air intake.
  14. Development and Applicationof a Program for the Computer Aided ...

    www3.eng.cam.ac.uk/outreach/Project-resources/Senior-glider/Aery-presentation-slides.pdf
    12 Oct 2011: Program Testing. Comparison of output with expected results. Construction of test gliders Insufficient directional stability Required lateral balancing.
  15. Garage Case_Tech_Note Draft Final January

    www3.eng.cam.ac.uk/~ss248/publications/Garage_Case_Revised.pdf
    11 Apr 2005: MIT Press, Cambridge, MA. Riggs, J. and West, T. (1986) Engineering Economics, McGraw-Hill, New York, NY. ... White, J. et al (1998) Principles of Engineering Economics Analysis, John Wiley and Sons, New.
  16. Proceedings of the International Association for Shell and Spatial ...

    www3.eng.cam.ac.uk/~sdg/preprint/tensegritree.pdf
    13 Apr 2022: Modularity: The geometrical symmetry in plan of the sculpture allows regularity, repetition and economic fabrication of members and end fittings.
  17. Experimental Investigation of a Double Layer Tensegrity Space Frame…

    www3.eng.cam.ac.uk/~sdg/preprint/TensegritySpaceFrame.pdf
    13 Apr 2022: To further investigate the structural behaviour of the structural model, a loading test was carried out while the model was pre-stressed with a 2mm extension using pattern (b).
  18. Rocketcarsinstructions

    www3.eng.cam.ac.uk/outreach/Project-resources/Rocket-car-derby/Rocketcarsinstructions.pdf
    12 Oct 2011: Sponsored by. 4. Test! – take your car to the testing ramp.
  19. D:\Papers\packaging_thin_shells\paper.dvi

    www3.eng.cam.ac.uk/~sdg/preprint/packaging.pdf
    13 Apr 2022: discussed. Initial tests of the optimization routine revealed that this multi-dimensional surface is very complex and uneven.Consequently, there are some relative minima which may be picked up before the
  20. FFinstructions_junior

    www3.eng.cam.ac.uk/outreach/Project-resources/Glider-design/FFinstructions_junior.pdf
    6 Jan 2010: 3. Now test your fun flyer in the flying zone! Top Tip: Think about how hard you should throw the glider.
  21. IASS2009_Final

    www3.eng.cam.ac.uk/~sdg/preprint/PAP111golabchi.pdf
    13 Apr 2022: The bending stiffness is determined by a computational simulation of a simple three-point bending test, as shown in Figure 6.

Search history

Recently clicked results

Recently clicked results

Your click history is empty.

Recent searches

Recent searches

Your search history is empty.